NOTICE OF DEED RESTRICTIONS: The undersigned understands that this permit may be subject to"deed"resUictions"
<br /> which may be more rest�ictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES: If the owner has hired a contractor or
<br /> contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
<br /> cont�actor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
<br /> under state law. If the owner or intended contractor a�e uncertain as to what Ifcensing requirements may apply for the
<br /> intended work, they are advised to contact the Pasco County Building Inspection Division--Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a cont�actor or contractors, he is advised to have the contractor(s) sign
<br /> portions of the "contractor Block° of this application for which they will be responsible. If you, as the owner sign as the
<br /> contractor, that may be an indication that he is not properly ticensed and is not entiNed to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACTIUTILITIES IMPACT AND RESOURCE RECOVERY FEES: The undersigned understan s
<br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
<br /> use in existing buildi�gs, or expansio� of existing buildings, as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned also understands, that such fees, as may be due, wiil be identified at the time of
<br /> permitting. It is further understood that Transpo�tation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a "certificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or
<br /> final power release, the fees must be paid prior to permit issuance. Furthermore, ff Pasco County Water/Sewer Impact
<br /> fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter 713, Flo�ida Statutes, as amended): If valuation of work is$2,500.00 or more, I
<br /> certify that I, the applicant, have been provided with a copy of the "Flo�ida Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Flo�ida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the"owner", 1 certify that I have obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the"owner"prior to commencement.
<br /> CONTRACTOR'S/OWNER'S AFFIDAVIT: I ce�tify that all the information in this application is accurate and that all work
<br /> will be done in compliance with all appiicable taws regulating construction, zoning and land development. Application is
<br /> hereby made to obtain a permit to do work and installation as i�dicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land devetopment regulations in the jurisdiction. I also
<br /> certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands, Water/Wastewater Treatment.
<br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls, Docks, Navigable Watervvays.
<br /> - Department of Health & Rehabilitative Services/Environmental Nealth Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> - US Environmental Protection Agency-Asbestos abatement.
<br /> Federal Aviation Authority-Runways.
<br /> I understand that the following restrictions apply to the use of fill:
<br /> Use of fill is not allowed in Flood Zone"V"unless expressly permitted.
<br /> If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction, I certify that fill will be used only to fill the area within the stem wall.
<br /> If fill material is to be used in any area, I ce�tify that use of such fill will not adversely affect adjacent
<br /> properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached permit application, for Iots less than one (1)
<br /> acre which are elevated by flll, an engineered drainage plan is required.
<br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction. I understand that a separate permit may be requfred for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or
<br /> set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned for a period of six(6) months after the time the work is commenced. An extension
<br /> may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate
<br /> justifiable cause for the extension. If work ceases for ninety(�)consecutive days, the job is considered abandoned.
<br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE F ER�R AN ATTO TS Y Y FUR PROPE RD N'FY OU 'N OTIC T�F BTAIN FINANCI TG, CONSUL7
<br /> WITH YOU D
<br /> FLORIDA JURAT(F.S. 117.0
<br /> OWNER OR AGENT CONTRACTOR
<br /> Subscribed and sworn to r aHirme re me th s Subscxibed and swom to(or a ed)before me thls
<br /> Jo-I I-r 2 by r0--//-(z- by
<br /> o islare personally known to me or has/have produced Wh Is/are perso ally known to me or has/have produced
<br /> � as IdentlficaBon. � , ��''�����-r`S� as(dentlficadon.
<br /> r,��.-i�,� � _
<br /> -�� �..L i �� � _ Notary Public
<br /> �„Q Notary Public ------�--
<br /> .. , .—_ .,�� .«,
<br /> Com i�n�l '' JACQUELIN OGE"s �______ Commissi No •�' ••,
<br /> � '� �iss��r�2 2014 ;�; �"`_ �mmission#EE 040520
<br /> = ' . -�,: Name of Nota ntelMoe eoo-3asao�e
<br /> Name of t� '•
<br />
|