Laserfiche WebLink
� Power Series, 0 n Transit6on, Malded Case Type, Service Entrance Rated <br /> STANDARD FEATURE : • LCD-based dispiay for programming, system diagnostics <br /> — • Double-throw, mecha ily interlocked transfer mecha- and Help Menu display <br /> ' nism • Mimic diagram with Source Available and Connected LED <br /> • High withstand and cl s ng ratings indication. <br /> � ' • Auxiliary relay contact • Time-stamped history log. <br /> — Source-1 Pres n , 2N0&2NC • System TEST pushbutton. <br /> — Source-2 Pres n , 2N0&2NC <br /> • Switch position indica contacts • Programmable plant exerciser—OFF, daily, 7 day interval <br /> — Source-1 Posit o , 1 NO & 1 NC selectable run time 0-600 minutes no load/load with <br /> — Source-2 Posit , 1 NO & 1 NC failsafe. <br /> • Source-1 and Source- ensing • Safe manual operation under full load with permanently <br /> — Undervoltage/u erfrequency affixed operating handle <br /> — Overvoltage/ov requency • Seismic Certified <br /> — Three-pjhase r t tion protection <br /> — Three-phase v It ge unbalance OPTIUNAL FEATURES: <br /> • Pretransfer signal cont ts 1 NO/1 NC • ATC-600 Digital Controller <br /> • Go to Source-2 (Emer ncy) • Multi-Tap transformer <br /> • Field Programmable Ti Delays • Space Heater with Thermostat <br /> — Time Delay En i e Start(TDES)� 0-1200 seconds <br /> — Time Delay No al to Emergency (TDNE) 0-1800 • Digital Multi-function Power Quality Metering <br /> seconds • Modbus or Ethernet Connectivity <br /> — Time Delay Em ency to Normal (TDEN) 0-1800 • Remote Annunciator Panel <br /> secontls <br /> — Time Delay En i e Cooldown (TDEC) 0-1800 • Additional Contacts <br /> second5 • Available NSS for power controiler, engine start circuit, <br /> — Time Delay Em ency Failure (TDEF): 0-6 phone and cable connections <br /> seconds <br /> • Ammeter—load side <br /> • Stainless steel cover for controller <br /> Fast, Powerful and S Power Switching Mechanism: <br /> The power panel utilizes a tlirectional gear motor mechanism. The power panel can be operated manually under a full load. This <br /> switch is not recommende or paralleled generator systems with load shedding. <br /> Integral Overcurrent r tection Capability: <br /> For Service Entrance applic ions,trip units are integrated in to the power switching section. This eliminates the need for separate up- <br /> stream protective devices, ving cost and space. <br /> ���ay,e„F �,a, .,�,�.. <br /> 1 '� <br /> ,�', <br /> +�, <br /> 1 <br /> a."#' ..�a• r t'sa;9�!t <br /> ;�,���'.� = - <br /> � � a <br />