Laserfiche WebLink
1 <br /> t <br /> 1 � <br /> ! <br /> 1 � <br /> t , <br /> ! 1 <br /> ' � SETTING AND FASTENING THE WINDOW ; <br /> 1 <br /> s A. �nstall sill spacer. Place a concinuous 1/4" thick spacer ac �o� � <br /> ; the bottom of the window opening.The spacer should be sr•� � <br /> � cut 1/2"shorter than the width oE the rough opening and be � <br /> � centaed becween the sides of the rough opening.DO NOT �� � <br /> ; shim between the bottom of the window and the bottom of � <br /> ; the rough opening. ...-' � <br /> ' Note:To detrrmine�the w8dth of the Spacer measvre the ' � �•:;;w. ; <br /> ; af�stanoe 6»m the bstdr af the 6n to fhe intuior fiame e�e II�with tl�e ' <br /> ; and cat the yaac+er'm this dlmeya+don.Place tLre e�s dk+p��' � <br /> ' e.zterior of tbe b�rll�dir�ImproP'e�'Pla��t ofs6/ma may r�dt in bowln�tlre ; <br /> � <br /> ' bottam of tLre w�ii�d'ow. e <br /> � ; <br /> < , <br /> , , <br /> ; B. Remove plastic wrap and cardboard packaging from window � <br /> ; DO NOT open the window until it is fully fastencd• ; <br /> ; Insp«�the unit for any crack or penetration in the frune• ; <br /> ' DO NOT instau dam.ged units. ` <br /> Y � <br /> f � <br /> a � <br /> ° 2 OR MORE PEOPLE WILL BE REQUIRED FOR THE FOLLOWING STEPS. ; <br /> , <br /> ; ; <br /> ! C.Insert the windaw from tlu e�[terior of the building. '� � <br /> � Plaoe the bouom of the window on the spaoer u che �2C �' - ., � <br /> bottom of the o ening,then tilc the top into position. ' ' ?�! <br /> � p , ;:.: °! <br /> � Center tho window between the sides of the opening to -. <br /> � � � allow ckarance for shimming,and insert one roofing nail �', °� <br /> ; in the first hole from the comer on each end of the top � �a <br /> � nailing fin���ane used to hold the window in plac.e t' ; <br /> � while shim :plumb and square• � �� <br /> ; Nore:DO NO!'driHe rhe nai!al!the wa,1 ia. <br /> r,` i <br /> � ^ ""� � � ,;��,.,`,+ <br /> ; D.Plumb an �e windaw.Place slums �� • Y -� <br /> ; 1" from the�.._..am and top of the wiadow <br /> ; betwoen t3ie window and the sides of the <br /> ; opening.Adjusc the shims as required co 2D . <br /> ; plutnb and square the window in the <br /> ; opet�u�g <br /> ; Casement and Fi�oed:If the fr�me height <br /> � ezceeds 47",plaae shitns at the midpomc <br /> ; of the window sid�es. <br /> ; DouWe and Single-hung:Be suc�e to shitn ' 2D <br /> ; u the checkrail.If the frame height aooeds <br /> ; 47",plaoe addidonal shims midway between ` <br /> ; the checkrail shims and both the top and <br /> � <br /> bottom shims. <br /> ; _. <br /> ; E. Fasten the windaw to opening by driving 2"galvaniud <br /> ; roofing nails into every othu pie-punchcd hok in the nailing <br /> �, t � fin.Drive nails until the had contaas the fin,however do noc ,` � <br /> � sink the head.This allows for mo�mc of building maoeriaLs. <br /> � DP 50:Insert#t8 z 2" pan had stainless sooel wood sQews � <br /> ; with Aat wash�ecs into every pre-punched hole in the nailing fu►• <br /> ; Drive saews until the head/washer contuts the fin,however do ZE � <br /> ; not sink the washer.This allows for movement of building macerial• F - <br /> � i � <br /> � F Check window opention(vent units only).Open and close che � �i <br /> ' window a few t�mes to ch«�k for proper operation.Close and lock Y' <br /> � the window <br /> � Double aad Siagle-hung:M�ke su�the window will tilc cornccdy. <br /> - - ••-- -e......,�r...r...� <br />