My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
13-13782
Zephyrhills
>
Building Department
>
Permits
>
2013
>
13-13782
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2013 11:28:10 AM
Creation date
9/13/2013 11:28:08 AM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE
Building Department - Doc Type
Permit
Permit #
13-13782
Building Department - Name
WALLACE,JAMES
Address
3524 PERIDOT LN
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. , /o� '�3 a <br /> Procedure for Lot Improvement Requests <br /> (Please refer to "Rules and Regulations') <br /> 1. All requests are to go to Chairman of the Property Evaluation Conunittee, for the committee <br /> to review. There is��r Isbri�d "P��o,o�rrt► .,���.. &I�evrnvraraeatsn in ti�libriM► <br /> for Lot _ .�a olux t��os�iebed�a�..::.���s�be oieloea�fi,s.. <br /> t�Lib�uv b91� — <br /> �oe � <br /> 2. Any re4uest which is NOT filled out properly or in detail, which includes, complete plan <br /> layout,elevations(where applicable), written details of improvement being roquesbod,includi�8 <br /> color,etc,aad any ot�er infarmation pertinent to#t�prooe�in�g of the roquest,�1�rel�r�d <br /> �vie�ved bv t�Co�� <br /> 3. Committse will review request,s and visit the site of the request as necessffiy. <br /> 4. After the Committee has approved or denied the reqi�est, it will be presented to the Boand of <br /> Directors for their approval or denial. <br /> 5. There will be NO more one day approvais or last minute approvais. Request wili take 7- 14 <br /> days for aPP�priate review and consideration,thus giving the Committoe and Board mcmbcrs <br /> time to review and consider the reqwest in a thorough maaner. <br /> 6. The original re9uest will be stamped approved or denied,and aft�er <br /> will go into to the meazbers file and the copy retumed to the Lot owner by the�Bo$rd of Director <br /> lisison to the committee. <br /> 7. The committ�ee will follow up on requests Lo determine th,at the request as p�sented�d <br /> a�roved is being adhered to_ <br /> As tite owner of Lot# " I understand the proPerty,Evaluaxion Commiuee and/or the <br /> Board of Direc,�Eors will en the prop�j.h,�follow the ext,ernal progress of t�e cons�on or <br /> emetrt,as submitted on the Lot Lnprovcment Req�st. <br /> ' �l � /'-- - l.� <br /> � s Signa�ure � <br /> 4/03/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.