My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
12-13657
Zephyrhills
>
Building Department
>
Permits
>
2012
>
12-13657
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/13/2013 12:03:38 PM
Creation date
9/13/2013 12:02:01 PM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR COMMONS
Building Department - Doc Type
Permit
Permit #
12-13657
Building Department - Name
SF ZEPHYR COMMONS LP
Address
7860 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
J <br />Q <br />(L <br />d <br />Q <br />Z <br />h <br />O <br />"o <br />z <br />81 <br />i� <br />z <br />W <br />X <br />0) <br />X <br />W <br />BAR JOIST OR BEAM — <br />'OP BEAM CLAMP <br />ALL - THREAD ROD <br />(LENGTHS VARY) <br />SWIVEL HANGER RING <br />ALL - THREAD ROD SIZES <br />FOR PIPE UP TO 4" IN DIAMETER, %" ROD TO BE USED <br />FOR 6" & 8" DIAMETER PIPE, Y" ROD TO BE USED <br />BRANCH LINE PIPE MAY HANG FROM THE BOTTOM OF STEEL. <br />ALL CROSS MAIN PIPING SHALL HANG TO THE TOP OF STEEL. <br />BARJOISTIBEAM HANGER DETAIL <br />Z_ BAR JOIST <br />1 —1 <br />TOP BEAM CLAMP <br />I L- <br />PIPE (SPECIFY <br />SIZE & LENGTH) <br />SWIVEL HANGER RING <br />—1 L- <br />-- -ALL- THREAD ROD <br />(LENGTHS VARY) <br />--- SWIVEL HANGER RING <br />ALL - THREAD ROD SIZES <br />FOR PIPE UP TO 4" IN DIAMETER, %" ROD TO BE USED <br />FOR 6" & 8" DIAMETER PIPE, Y2" ROD TO BE USED <br />BRANCH LINE PIPE MAY HANG FROM THE BOTTOM OF STEEL. <br />ALL CROSS MAIN PIPING SHALL HANG TO THE TOP OF STEEL. <br />W TRAPEZE HANGER DETAIL <br />AN <br />J <br />W <br />z <br />Q <br />a <br />a- <br />0) <br />�L <br />ILL <br />0 <br />CL <br />W <br />z <br />0 <br />STEEL PIPE HANGER <br />LOCATION DETAIL <br />PIPE SIZE <br />A <br />B <br />C <br />1" <br />S -0" MAX <br />12' -0" MAX <br />3 "MIN <br />1 1/4' <br />4' -0" MAX <br />12' -0" MAX <br />YMIN <br />1 1/2-- 8" <br />5' -0" MAX <br />12' -0" MAX <br />3 0MIN <br />IIM1k2LI\ <br />NTS <br />NTS <br />THE UNSUPPORTED LENGTH BETWEEN THE END SPRINKLER AND THE LAST <br />HANGER ON THE LINE SHALL NOT EXCEED 36" FOR 1" PIPE, 48" FOR 1Y" PIPE <br />AND 60" FOR 1Y" PIPE OR LARGER. <br />THE CUMULATIVE HORIZONTAL LENGTH OF AN UNSUPPORTED ARMOVER TO A <br />SPRINKLER, SPRINKLER DROP, OR SPRIG -UP SHALL NOT EXCEED 24 ". <br />0 PIPE HANGER SCHEDULE NTS ( 1 <br />SHEET NOTES <br />1O EXISTING RECESSED PENDENT SPRINKLERS TO REMAIN. <br />QRELOCATE EXISTING PENDENT SPRINKLER USING A 4' -0" FLEX -HEAD. <br />OINSTALL A 2" x 1 "" MECHANICAL TEE AND PIPE OVER 6' -0" AND INSTALL <br />(3) TOTAL SPRINKLERS AS SHOWN. <br />4O RELOCATE EXISTING PENDENT SPRINKLER USING A 6' -0" FLEX -HEAD. <br />5O REMOVE EXISTING 900 ELBOW AT THE EXISTING SPRINKLER, INSTALL A 1" <br />TEE AND MOVE EXISTING AS SHOWN AND ADD OTHER AS SHOWN. <br />OREMOVE EXISTING 90° ELBOW ABOVE EXISTING SPRINKLER, INSTALL A 1" <br />TEE, RE- INSTALL HEAD AND PIPE TO OTHER SPRINKLER WITH S -0 "PIECE <br />OF PIPE. <br />EXISTING EXISTING EXISTING <br />BRANCHLINE BRANCHLINE BRANCHLINE <br />1 I 1 <br />1 !I I 1 <br />j <br />' 6 i <br />j I � <br />4 <br />_ — 1 <br />O <br />I I I � - I <br />_} } - - 2 - F I _� - t <br />-- ! j I �� <br />_ <br />r <br />L <br />�- <br />- <br />i- -_ <br />I I I <br />1 1 I <br />1 NEW OFFICE PIPING PLAN <br />Scale:: 1/4' = V -0° <br />Sprinkler Head Schedule <br />Symbol <br />Count <br />Thread <br />K— Factor <br />Description <br />Note <br />O <br />10 <br />1 /2" <br />5.6 <br />TY3231 Y2" QR 1155 -F CHROME RECESSED <br />on Drop <br />10 = Total Number of Heads this floor <br />FIRE PROTECTION GENERAL NOTES <br />1. WET PIPE SPRINKLER SYSTEM DESIGNED PER NFPA 13, 2007 EDITION. <br />LIGHT HAZARD OCCUPANCY (OFFICE) USING .10gpm OVER THE MOST REMOTE 1500 sq.ft., 225 <br />sq.ft. MAXIMUM HEAD SPACING & 100gpm HOSE STREAM TO MEET OR EXCEED THE REQUIREMENTS <br />OF NFPA 13, 2007 EDITION AND LOCAL AUTHORITIES. <br />2. ALL FIRE SPRINKLERS SHALL BE IN ACCORDANCE WITH NFPA 13, 2007 EDITION. <br />3. ALL WORK SHALL BE DONE IN ACCORDANCE WITH NFPA 13, 2007 EDITION. <br />4. ALL HANGERS & MATERIALS TO BE IN ACCORDANCE WITH NFPA 13, 2007 EDITION. <br />5. ALL BRANCH LINE PIPING TO BE SCHEDULE 40 BLACK PIPE, U.N.O. <br />6. PIPE TO HANG AT 12 "± ABOVE FINISHED CEILING. COORDINATE NTH ALL STRUCTURAL <br />ELEMENTS AND ABIDE BY ALL OBSTRUCTION RULES PER NFPA 13, 2007 EDITION AND FIRE <br />SPRINKLER MANUFACTURER'S SPECIFICATIONS. <br />7. SPRINKLER HEAD SPACING IS PER NFPA 13, 2007 EDITION. <br />8. ALL GROOVED FITTINGS TO BE "VICTAULIC" FITTINGS OR APPROVED EQUAL. <br />9. ALL DIMENSIONS TO BE VERIFIED DURING FIELD CHECK OF SPRINKLER SYSTEM. <br />10. THE FOLLOWING ARE ACCEPTABLE SPRINKLER HEAD MATERIAL MANUFACTURERS: <br />RELIABLE, TYCO, VICTAULIC, VIKING <br />11. SPRINKLER SYSTEMS, INCLUDING ALL ASSOCIATED FIRE PROTECTION SIGNALS, SHALL BE <br />SUPERVISED BY AN APPROVED CENTRAL, PROPRIETARY, AUXILIARY, OR REMOTE STATION SYSTEM <br />IN ACCORDANCE WITH NFPA. <br />12. ALL FIRE SPRINKLER COMPONENTS ARE TO BE RATED FOR THE MAXIMUM SYSTEM WORKING <br />PRESSURE TO WHICH THEY ARE EXPOSED IN ACCORDANCE WITH WFPA 13, 2007 EDITION, SECTION <br />6.1.3. <br />13. OPERATING AND MAINTENANCE INSTRUCTIONS, PRINTED AND BOUND IN HARD COVER <br />THREE -RING LOOSE LEAF NOTEBOOKS, SHALL BE PROVIDED TO THE OWNER. <br />SCOPE OF WORK NOTES <br />ADD AND RELOCATE EXISTING PENDENT SPRINKLERS TO ACCOMMODATE NEW OFFICE WALL LAYOUT. <br />ALL FLEX -HEADS TO VICTAULIC TYPE. <br />GRAPHIC SCALE <br />12" 0 1' 4' 7' 11' <br />1/4"= 1 P-0)? <br />No. I Revision /Issue <br />� V <br />N <br />._ tT <br />Zi'f ti <br />W V) <br />N <br />Engineering Review By: <br />Z <br />O <br />0 <br />w <br />z <br />U <br />Q <br />Q <br />Date <br />O <br />M ' <br />a <br />0 N <br />O� <br />Z O <br />LIJ <br />Q :iz <br />o <br />Z <br />Ll ° o <br />L <br />O U <br />1 \0 � <br />N <br />� M <br />�o 00 <br />m Z <br />. O <br />oz <br />CL 4„ <br />Drawn By. Checked By: <br />FKG I WDP <br />Engineers Seal: <br />Project Nome and Address: <br />PASCO REGIONAL <br />ZEPHYRHILLS, FLORIDA <br />Project No: <br />12 -164 <br />Date: <br />NOVEMBER 14, 2012 <br />Scale: <br />SEE PLAN <br />DRAWING NO: <br />FP I /, ,Oo <br />G & P Engineering LLC <br />P.O. Box 196725 <br />Winter Springs, Fl. 32719 -6725 <br />(407) -4763031 <br />Florida PE License #67330 <br />FIRE PROTECTION <br />C.A. #29937 <br />ENGINEERS <br />Drawn By. Checked By: <br />FKG I WDP <br />Engineers Seal: <br />Project Nome and Address: <br />PASCO REGIONAL <br />ZEPHYRHILLS, FLORIDA <br />Project No: <br />12 -164 <br />Date: <br />NOVEMBER 14, 2012 <br />Scale: <br />SEE PLAN <br />DRAWING NO: <br />FP I /, ,Oo <br />
The URL can be used to link to this page
Your browser does not support the video tag.