My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
13-13913
Zephyrhills
>
Building Department
>
Permits
>
2013
>
13-13913
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2014 12:49:02 PM
Creation date
1/22/2014 12:49:00 PM
Metadata
Fields
Template:
Building Department
Company Name
EMERALD POINTE RV RESORT
Building Department - Doc Type
Permit
Permit #
13-13913
Building Department - Name
KELLY LINDA S REV TRUST & JAMES
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Procedure for Lot Improvement Requests <br /> (Please refer to "Rules and Regulations') <br /> 1. All requests are to go to Chairman of the Property Evaluation Committee, for the committee <br /> to review. There is a�i,old�r„l�led "Pronertv Eva[ttation � I�aoroverteabs" in the libr�r� <br /> for Lot o�vaers xo.nlsce t�ir ooe�nie,t�d fornu in and these forms w►iU be uick�l an 6�om <br /> tbe Librarv b�►I�e ProOertv Evslastioa com�mitt�e. -- <br /> 2. Any requ�est which is NOT filled out properly or in detail, which includes, complete plan <br /> layout,elevations (where applicable), written details of improvement being requested, includin.g <br /> color, ctc,and any other information pertinent to the processing of the reqwcst, w�iII be� <br /> to the Lot ow�er for eo� �re b�i�revie7ved bv the Committee. <br /> 3. Committee will review requests and visit the site of the request as necessary. <br /> 4. After the Committee has approved or denied the request, it wili be presented to the Board of <br /> Directors for their appmval or denial. <br /> 5. There will be NO more one day approvals or lasi minute approvals. Request will take 7- 14 <br /> days for appropriate review and consideration, thus giving the Committee and Board mcmbcrs <br /> time to review and consider the request in a thorough manner. <br /> b. The original request will be stamped approved or denied, and after being copied the onginal <br /> will go into to the members file and the copy retumed to the Lot or�ner by the Board of Director <br /> liaison to the committee. <br /> 7. The committee will follow up on requests to determine that the request as presented and <br /> approved is being adhered to. <br /> A.s the owner of Lot# ,,2�`-� , I understand the Property Evaluation Com.mittee and/or the <br /> Board of Directors will enter the properly to follow the external progress of the consttuction or <br /> improvement,as submitted on the Lot Improvement Request. <br /> _ � <br /> t er's Signa�ure Date <br /> 4/03/06 <br />
The URL can be used to link to this page
Your browser does not support the video tag.