Laserfiche WebLink
NOTICE OF DEED RESTRICTIONS. The undersigned understands that this permit may be subject to"deed"restrictions" <br /> which may be more resVictive than County regulations. The undersigned assumes responsibiliry for compliance with any <br /> applicabie deed restrictions. <br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES. If the owner has hired a contractor or <br /> conUactors to undertake work,they may be required to be licensed in accordance with state and local regulations. If the <br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation <br /> under state law If the owner or intended contractor are uncertain as to what licensing requirements ma,y apply for the <br /> intended work,they are advised to contact the Pasco County Building Inspection Division--Licensing Sedion at 727-847- <br /> 8009 Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign <br /> portions of the"contractor Block"of this application for which they will be responsible. If you, as the owner sign as the <br /> contractor,that may be an indication that he is not properly licensed and is not entiUed to permitting privileges in Pasco <br /> County <br /> TRANSPORTATION IMPACTNTILITIES IMPACT AND RESOURCE RECOVERY FEES. The undersigned understands <br /> that Transportation Impact Fees and Recourse Recovery Fees may apply to the construction of new buildings,change of <br /> use in exisdng buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and <br /> 90-07, as amended. The undersigned also understands,that such fees,as may be due,will be idenbfied at the time of <br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to <br /> receiving a"certificate of occupancy"or final power release. If the project dces not involve a certificate of occupancy or <br /> final power release,the fees must be paid prior to permit issuance. Furthermore, if Pasco County WaterlSewer Impact <br /> fees are due,they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances. <br /> CONSTRUCTION LIEN LAW(Chapter 713,Florida Statutes,as amended): If valuation of work is$2,500.00 or more,I <br /> certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law--Homeowner's <br /> Protection Guide"prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone <br /> other than the"owner",I certify that I have obtained a copy of the above described document and promise in good faith to <br /> deliver it to the"owner"prior to commencement. <br /> CONTRACTOR'S/OWNER'S AFFIDAVIT i certify that all the information in this application is accurate and that all work <br /> will be done in compliance with all applicable laws regulating construction,zoning and land development. ApplicaGon is <br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has <br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating <br /> construction, County and City codes, zoning regulations, and land development regula6ons in the jurisdiction. I also <br /> certify that I understand that the regulations of other govemment agencies may apply to the intended work,and that it is <br /> my responsibility to identify what actions I must take to be in compliance. Such agencies indude but are nok limited to: <br /> - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive <br /> Lands,WateNWastewater Treatment. <br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, WeUand Areas, Altering <br /> Watercourses. <br /> - Army Corps of Engineers-Seawalls,Docks,Navigable Waterways. <br /> - Department of Health 8 Rehabilitative ServiceslEnvironmental Health Unit-Wells, Wastewater Treatment, <br /> Septic Tanks. <br /> - US Environmental Protection Agency-Asbestos abatement. <br /> - Federal Aviation Authority-Runways. <br /> I understand that the following resVictions apply to the use of fill: <br /> - Use of fill is not allowed in Flood Zone"V"unless expressly permitted. <br /> - If the filt material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a <br /> "compensating volume"wilt be submitted at time of permitting which is prepared by a professional engineer <br /> licensed by the State of Florida. <br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall <br /> construction,I certify that fill will be used only to fill the area within the stem wall. <br /> - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent <br /> properties. If use of fi�l is found to adversely affect adjacent properties,the owner may be cited for violating <br /> the conditions of the building permit issued under the attached permit application,for lots less than one(1) <br /> acre which are elevated by fill,an engineered drainage plan is required. <br /> If I am the AGENT FOR THE OWNER,I promise in good faith to inform the owner of the permitting conditions set forth in <br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for elecVical work, <br /> plumbing, signs, we�ls, pools, air conditioning, gas, or other installations not spedfically induded in the application. A <br /> permit issued shall be consVued to be a license to proceed with the work and not as authority to violate,cancel,alter,or <br /> set aside any provisions of the technical codes,nor shall issuance of a permit prevent the Building Offiaal from thereafter <br /> requiring a correction of errors in plans,consUuction or violations of any codes. Every permit issued shall become invalid <br /> unless the work authorized by such permit is commenced within six months of permit issuance,or if work authorized by <br /> the permit is suspended or abandoned for a period of six(6)months afler the time the work is commenced. An extension <br /> may be requested, in writing,from the Building Official for a period not to exceed ninety(90)days and will demonstrate <br /> justifiable cause for the extension. If work ceases for ninety(90)consecutive days,the job is considered abandoned. <br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOT�CE OF COMMENCEMENT MAY RESULT IN YOUR <br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU INTEND TO OBTAIN FINANCING,CONSULT <br /> WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR NOTICE OF COMMENCEMENT. <br /> FLORIDA JURAT(F.S.117.03) <br /> OWNER OR AGENT CONTRACTOR � iRZ�—� _ <br /> Subscribed and s to(oraf rtned)before me this ubscribed and swor to( i ed)before me this <br /> 3-/-�3 cy h /'/3 by �rec l�c�e b� _ <br /> Who is/are personall to me or has/have produced Who is/are personally kno �me a has/have produced <br /> as identification. " as identification. <br /> Not Public ,\;;�`'�'CJ � otary Public <br /> Com is� � ^ Commissian No. <br /> :�� 'X�� Commission EE 105Q42 ;�����;•, JOHNSON <br /> Nam " ' •d E� � , Name of Notary t ��t pm <br /> ''�;Y;,�;.�• B�MBd'fFwTr�yFainln;�uanw80tY385-7U19 �'�,+' � i►�June23,2015 <br /> '�;R�4:°,g a:nkn lhr�rroy Pzln Ins�,raar�ce aoa38s�ro�o <br />