Laserfiche WebLink
Procedure for Lot Improvement Requests �� O� <br /> (Please refer to "Rules and Regulatiorr.r') <br /> 1. All requests aze to go to Chairman of the Property Evaluation Committee, for the committee <br /> to review. There is a holdsr la�sJe�l,►'Proverlv EvaL��n d� I�mrev��ee�"in the librarv <br /> for Lot ow►�ers to. tkdr e�o�ed foras in asd these w►Bl be eie�oed ee� <br /> the I.�ruv b�►1ie Pr�rt�►Ev�ooa��t�ee, <br /> 2• �1nY reQuest which is NOT filled out properly or in detaii, which includ�s, complete plan <br /> tayout,elevations (where applicable), written details of improvement being roquestod,inciyding <br /> color,etc,aad say otl�cr information peranent to�prooessing of t�e roq�st,w�l be r�ed <br /> ' ed bv the Coa��.tt� <br /> 3. Committse will revieH,requ�,�a�d visit the site of the request as necessary. <br /> 4• After the Committee has approyed or denied the request, it will be presented to the Boatd of <br /> Directors for their approval or denial. <br /> 5. There will be NO more one day approvals or last minute approvals. Request will take 7- 14 <br /> days for appropriate review and eonsideration,thus giving the Committee and Board mcmbcrs <br /> : time to review and consider the rec�uest in a thorough manner, <br /> 6. The orig� request vvill be stamped approved or denied, and after being copied the original <br /> �i118o into to the members file and the copy returned to the Lot owner by the Board of Director <br /> liaison to the committee, <br /> �. The committae will follow up on requests to determine that the request as presented and <br /> approved is being a�hered to. <br /> � <br /> As the owner of Lot#�y/ , I understand the Propecty Evaluation Comm.ittee aad/or the <br /> Board of Dir�octors will enter the property to follow the external progres,s of thc conslruction or <br /> �P���en �tted n the Lot Improvement Request. <br /> '� -��,��— 8 D�o / <br /> Lot er's Si� ate <br /> 4/03/06 <br />