Laserfiche WebLink
Project: FMC -Urgent Care <br /> Title: FMC- Urgent Care <br /> Type: Healthcare-Clinic <br /> (WEA File: FL_TAMPA_INTERNATIONAL AP.tm3) <br /> Building End Uses <br /> 1) Proposed 2) Baseline <br /> TOtal 256.80 323.30 <br /> �4,026 $5,114 <br /> ELECTRICITY(MBtulkWhl$) 256.80 323.30 <br /> 75255 94695 <br /> $4,026 $5,114 <br /> AREA LIGHTS �i.so 65.30 <br /> 20956 19131 <br /> $1,121 $1,033 <br /> HEAT REJECT o.o0 2s.�o <br /> 0 7523 <br /> $0 $406 <br /> MISC EQUIPMT so.2o so.2o <br /> 14717 14717 <br /> $787 $795 <br /> PUMPS 8� MISC 4.10 io.io <br /> 1198 2945 <br /> $64 $159 <br /> SPACE COOL gs.bo 143.40 <br /> 25069 42006 <br /> $1,341 $2,268 <br /> SPACE HEAT 2.ao ib.to <br /> 711 4713 <br /> $38 $255 <br /> VENT FANS 43.00 �2.so <br /> 12604 3660 <br /> $674 $198 <br /> Passing requires Proposed Building cost to be at most SO% � PASSES <br /> of Baseline cost. This Proposed Building is at 78.7% <br /> EnergyGauge Summit0 FlalCom-2010. Sec6on 506.4 Compliant Software. Effective Date: March 15, 2012 <br /> 6/12/2012 Page 4 of'16 <br />