Laserfiche WebLink
Han�cLer #3 <br /> New SR WiteBrite Liquid Applied Seamless Membrane <br /> Roofinq Svstem <br /> SCOPE OF WORK <br /> 1 Ob#ain all necessary permitting on the Owner's behalf <br /> 2. Install necessary safety equipment including warning lines 10' from the roof edge. All <br /> employees working outside of the warning lines will be tied off 100% of the time. <br /> 3. All workers onsite will be full time employees of Simon Roofing and have been E-Verified <br /> and drug tested. <br /> 4 Pertorm a pre-construction meeting with airport personnel to assure all safety <br /> precautions and plans are in agreement for a safe working environment that will not <br /> disturb the operations of the airport. <br /> 5. Inspect all fasteners throughout the entire roof and replace or tighten as needed. <br /> 6. Install new foam closures on both sides of the vented ridge cap(484 LF Total). <br /> 7. Wire brush any surface rust found to remove the rust and expose the bare metal. <br /> 8 Power-wash the entire roof to ensure a clean surtace for the WiteBrite membrane. <br /> 9. Prime the entire roof (12,100 Sq.Ft.) using SR WiteBrite Primer Plus with zinc to inhibit <br /> future rusting. <br /> 1 Q. Encapsulate all fasteners (Approx. 7,200), new and old to assure they are water tight <br /> and to prevent future rusting. <br /> 11. Seal both rake edges (100'} using a multi-course application of SR WiteBrite Cement <br /> and Poly. <br /> 12. Flash one 10'x3' ridge vent curb using a multi-course application of SR WiteBrite <br /> Cement and Poly. <br /> 13. Install a layer of SR WteBrite over the entire roof area (12,100 Sq Ft.). <br /> 14. Install a second and final layer of SR WiteBrite over the entire roof area (12,100 Sq.Ft.). <br /> 15. Provide the airport with a 10 year labor and materials warranty to cover the entire <br /> system. The warranty will be 100%through Simon Roofing for the entirety of the term as <br /> we are both the manufacturer and installer of the SR WiteBrite system. <br /> Optional: Install new gutter and kickouts on both sides of the building (484 LF) <br /> to match the other hangers. <br /> �1�t0\ It00}1\(:.�\p tiHM:�"t'�1k.7:�l.C't)IZR <br />