Laserfiche WebLink
...-�. <br /> �,�,�rf ����7� <br /> CONTRACTOR'S MATERIAL AND TEST CERTIFICATE FOR UNDERGROUND PIPING <br /> PROCEDURE <br /> UPON COMPLETION OF WORK,INSPECTION AND TESTS SHALL BE MADE BY THE CONTRACTOR'S REPRESENTATIVE AND <br /> WITNESSED BY OWNER'S REPRESENTATIVE. ALL DEFECTS SHALL BE CORRECTED AND SYSTEM LEFT IN SERVICE BEFORE <br /> CONTRACTOR'S PERSONNEL FINALLY LEAVE JOB <br /> A CERTIFICATE SHALL BE FILLED OUT AND SIGNED BY BOTH REPRESENTATIVES COPIES SHALL BE PREPARED FOR <br /> APPROVING AUTHORITIES,OWNERS,AND CONTRACTOR. IT IS UNDERSTOOD THE OWNER'S REPRESENTATIVE'S SIGNATURE <br /> IN NO WAY PREJUDICES ANY CLAIM AGAINST CONTRACTOR FOR FAULTY MATERIAL,POOR WORKMANSHIP,OR FAILURE <br /> TO COMPLY WITH APPROVING AUTHORITY'S REQUIREMENTS OR LOCAL ORDINANCES. <br /> PROPERTY NAME PANERA DATE <br /> PROPERTY ADDRESS 7242 GALL BLVD <br /> ACCEPTED BY APPROVING AUTHORITIES CITY OF ZEPHYRHILLS <br /> ADDRESS <br /> PLANS INSTALLATION CONFORMS TO ACCEPTED PLANS YES X NO <br /> EQUIPMENT USED IS APPROVED YES X NO <br /> IF NO,EXPLAIN DEVIATIONS <br /> HAS PERSON IN CHARGE OF FIRE EQUIPMENT BEEN INSTRl1CTED AS YES X NO <br /> TO LOCATION OF CONTROL VALVES AND CARE AND MAINTENANCE <br /> OF THIS EQUIPMENT? <br /> INSTRUCTIONS IF NO,EXPLAIN <br /> HAVE COPIES OF APPROPRIATE INSTRUCTIONS AND CARE AND YES X NO <br /> MAINTENANCE CHARTS BEEN LEFT ON PREMISES? <br /> IF NO,EXPLAIN <br /> LOCATION SEE PLAN <br /> PIPE TYPES AND CLASS TYPE JOINT <br /> C900 DR14 MECHANICAL <br /> UNDERGROUN PIPE CONFORMS TO STANDARD NFPA 24 YES X NO <br /> PIPES AND FITTINGS CONFORM TO STANDARD NFPA 24 YES X NO <br /> JOINTS IF NO,EXPLAIN <br /> JOINTS NEEDING ANCHORAGE CLAMPED,STRAPPED,OR BLOCKED IN YES X NO <br /> ACCORDANCE WITH STANDARD NFPA 24 <br /> IF NO,EXPLAIN <br /> FLUSHING FLOW THE REQUIRED RATE UNTIL WATER IS CLEAR AS INDICATED BY NO COLLECTION OF FOREIGN MATERIAL <br /> IN BURLAP BAGS AT OUTLETS SUCH AS ITYDRANTS AND BLOW-OFFS FLUSH AT FLOWS NOT LESS THAN 390 GPM FOR 4-INCH <br /> PIPE,880GPM FOR 6-INCH PIPE, 1560 GPM FOR 8-INCH PIPE,2440 GPM FOR 10-INCH PIPE AND 3520 GPM FOR 12-INCH PIPE. <br /> TEST WHEN SUPPLY CANNOT PRODUCE STIPULATED FLOW RATES,OBTAIN MAXIMUM AVAILABLE. <br /> DESCRIPTION HYDROSTATIC�TESTS SHALL BE MADE AT NOT LESS THAN 200 PSI FOR TWO HOURS OR 50 PSI ABOVE STATIC PRESSURE <br /> IN EXCESS OF 150 PSI FOR TWO HOURS <br /> LEAKAGE.NEW PIPE LAID WITH RUBBER GASKETS JOINTS SHALL,IF THE WORKMANSHIP IS SATISFACTORY,HAVE LITTLE <br /> OR NO LEAKAGE AT THE JOINTS THE AMOUNT OF LEAKAGE AT THE JOINTS SHALL NOT EXCEED 2 QTS PER HR.PER 100 <br /> IRRESPECTIVE OF PIPE DIAMETER.THE LEAKAGE SHALL BE DISTRIBUTED OVER ALL JOINTS IF SUCH LEAKAGE OCCURS AT A <br /> FEW JOINTS THE INSTALLATION SHALL BE CONSIDERED UNSATISFACTORY AND NECESSARY REPAIRS MADE.THE AMOUNT <br /> OF ALLOWABLE LEAKAGE SPECIFIED ABOVE MAY BE INCREASED BY 1 FL OZ PER IN.VALVE DIAMETER PER HR.FOR EACH <br /> METAL SEATED VALVE ISOLATING THE TEST SECTION.IF DRY BARREL HYDRANTS ARE TESTED WITH THE MAIN VALVE OPEN, <br /> SO THE HYDRANTS ARE UNDER PRESSURE,AN ADDITION 5 OZ PER MINUTE LEAKAGE IS PERMITTED FOR EACH HYDRANT <br /> NEW UNDERGROUND PIPING FLUSHED ACCORDING TO YES X NO <br /> STANDARD NFPA 24 <br /> IF NO,EXPLAIN <br /> FLUSHING HOW FLUSHING FLOW WAS OBTAINED THROUGH WHAT TYPE OPENING <br /> TESTS X PUBLIC WATER TANK OR RESERVOIR FIRE PUMP HYDRANT X OPEN PIPE <br /> LEAD-INS FLUSHED ACCORDING TO STANDARD'NFPA 24 YES X NO <br /> IF NO,EXPLAIN <br /> HOW FLUSHING FLOW WAS OBTAINED THROUGH WHAT TYPE OPENING <br /> X PUBLIC WATER TANK OR RESERVOIR FIRE PUMP X OPEN PIPE FLG SPIGOT <br /> PAGE 1 OF 2 <br />