� + <br /> • • �� Insp No. Date: Sheet <br /> 3 05/16/13 1 <br /> Bracken W��er Time: Temp <br /> E N G I N E E R I N G SUnn 12:30-1:00 OG�F <br /> ProjectlTask <br /> 713-002 <br /> Present Jeremy from Bracken Engineering and Vanselow Property <br /> Foreman Jessie Jacobs and CFI crew <br /> UNDERPIN MONITORING FIELD REPORT <br /> ITEMS COMPLETED: Pin#'s(w/Photo) <br /> � Removed Surface Obstructions/Cored Slab <br /> X❑ Excavated 1(2-4)2(2,5)3(6)4(7-8)6(11-12)8(13-14) <br /> � Subsurface Obstruction Encountered <br /> � Required elimination of obstruction(see notes� <br /> � Required orientation of pin to be changed(see notes) <br /> � Required relocation of pin(see notes) <br /> � Footing preparation/mod'fiication <br /> � Saw Cut/Chiseled/Bushed <br /> � Placement of steel(as called for) <br /> � Placement of steel(not called for) <br /> �X Pin Installation 1(2-4)2(2,5)3(6)_�-8)5(9-10)6(11-12)8(13-14) <br /> ��(��i�t2�_' <br /> CheCkIlSt: (place an X in box'rf completed) <br /> � Met with site Foreman: Jessie Jacobs � Verified vertical angle of pin installation(<5°) <br /> � Recorded excavation at pin locations � Ver�ed spreader beam was centered on bracket <br /> � Noted and recorded information on deviations � Ver�ed direction of spreader beam for interior pins <br /> � Recorded footer preparation for pin locations � Dimensioned footers and slabs <br /> � Recorded placement of steel spreader beams � Dimensioned as-buift pin locations <br /> � Recorded installation of pins � Approximate date for lift: <br /> � Recorded pin installation pressures � Took photos of work done <br /> � Verfied flush connection to face and under footing � Took photos of deficiencies 8�deviations or damage <br /> GENERAL OBSERVATIONS/COMMENTS: <br /> •Torque for helical pile installations recorded. <br /> •Pin#11 torque numbers will be emailed by contractor <br /> The purpose of this site visit was to establish and verify that the construction activities observed and recorded were in substarrtial <br /> compliance with the contract documents as well as acceptable industry standards.Portions of the infortnation found wRhin this report <br /> were obtained and provided by the contractor Therefore,Bracke�Engineering,Inc.reserves the right to revise or update any of the <br /> observations,assessment and/or recommendations as conditions change or additional information becomes available. <br /> Report by Reviewed by Attachments: �: <br /> JRH JCB Photo Proofsheets 713-002 <br /> 2701 W Busch Btvd.,Suite 200,Tampa,Florida 33618 T 800.971.7252 F 9t3.243.9530 <br /> BRACKENENGINEERING.COM <br />