Laserfiche WebLink
� � �� insp.No. Date: Sheet <br /> 2 OS/15/13 � <br /> Bracken W��e� Time Temp <br /> EN � � NEER � N � Sunn 10:45-12:15 77°F <br /> Project/Task <br /> 713-002 <br /> Present Jeremy from Bracken Engineering and Vanselow Property <br /> Foreman Jessie Jacobs and CFI crew <br /> UNDERPIN MONITORING FIELD REPORT <br /> ITEMS COMPLETED: Pin#'s(w/Photo) <br /> X� Removed Surtace Obstructions/Cored Slab 5(47),11(8-9,29),12(10-11 30) <br /> QX Excavated 5(4-7) <br /> � SubsurFace Obstruction Encountered <br /> � Required elimination of obstruction(see notes) <br /> � Required orientation of pin to be changed(see notes) <br /> � Required relocation of pin�see notes) <br /> � Footing preparation/mod�cation <br /> XQ Saw Cut Chiseled Bushed 7(17-19) <br /> � Placement of steel(as called for) <br /> � Placement of steel(not called for) <br /> XQ Pin Installation 7(17-19) <br /> Ch@Ckllst: (place an X in box if completed) <br /> � Met with site Foreman: Jessie Jacobs � Verified vertical angle of pin installation(<5°) <br /> � Recorded excavation at pin locations � Verified spreader beam was centered on bracket <br /> Q Noted and recorded information on deviations [� Ver�ed direction of spreader beam for interior pins <br /> � Recorded footer preparation for pin locations � Dimensioned footers and slabs <br /> � Recorded placement of steel spreader beams � Dimensioned as-built pin locations <br /> � Recorded installation of pins � Approximate date for I'rft: <br /> � Recorded pin installation pressures � Took photos of work done <br /> � Ve�ed flush connection to face and under footing � Took photos of deficiencies&deviations or damage <br /> GENERAL OBSERVATIONS/COMMENTS. <br /> •Torque for helical pile installations recorded. <br /> •Interior slab was 5". <br /> •Pin#5 was moved(by contractor)to opposite side of wall due to crack in slab(observed). <br /> •CFI was informed to not install pin#5. <br /> •Pins#1,2,4,9,10 were already backfflled by coirtractor.CFI was informed to excavate already backfilled pins for <br /> steel placemeM verification. <br /> •Pins#3 and#6 were already backTllled and a new slab poured. <br /> •Pin#7 was observed to have a thickened footer. <br /> The purpose of this site visit was to esiablish and verify that the construction activities observed and recorded were in substantial <br /> compliance with the contract documents as well as acceptable industry standards.Portions of the information fou�d within this report <br /> were obtained and provided by the contractor Therefore,Bracke�Engineering,Inc.reserves the right to revise or update any of the <br /> observations,assessment andlor recommendations as condkions change or additional information becomes available. <br /> Report by Reviewed by Attachments: <br /> �: <br /> JRH JCB Photo Proofsheets ���002 <br /> 2701 W.Busch Blvd.,Suite 200,TampQ,F'(orida 336�g T 800.971.7252 F 813243.9530 <br /> BRQCKENENGINEERING.COM <br />