My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
10-11104
Zephyrhills
>
Building Department
>
Permits
>
2010
>
10-11104
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/25/2014 11:09:04 AM
Creation date
3/25/2014 11:04:34 AM
Metadata
Fields
Template:
Building Department
Company Name
WHEELBLAST
Building Department - Doc Type
Permit
Permit #
10-11104
Building Department - Name
WHEELBLAST
Address
3951 COPELAND DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�IfiY f�F �P� ' ' � L� <br /> "Citp of Pure Water" <br /> �'� 5335 Eighth Street�•Zephyrhills,Florida 33542-4312 <br /> ` (813)780-0000•Fax(813)780-0005 _ <br /> Error! Not a valid bookmark self-re�erence. <br /> ctober 22,2010 <br /> CLIFF MC bUFFIE <br /> Mayor <br /> �ITY COUNCIl, ichael Lynch <br /> resident <br /> LANC�SMITH ���laS� <br /> Council President 951 Copeland Drive <br /> ephyrhills,FL 33542 <br /> KENNETH V.COMPTON <br /> vice Presiaent r,LynC�t, <br /> JOI�I WILKFSON er the September 22,2010 Site Plan Approval Committee meeting item 16-10-SPR is approved <br /> er the followeng conditions: <br /> MANNY FUNPS �. p�ADA paved parking spot will be required.Coordinate details with the <br /> TIM URBAN building department,Reflect the addition of an ADA paveti parking spot <br /> on final"as-built"or site plan prior to D.O. <br /> + The"eastside driveway"should be brought up to commerciai standards <br /> (concrete,culvert and dirt control per Public Works standards). <br /> � A turn�ut(driveway)constructed per the FDOT standard attached,the <br /> STEVEN F.SPINA drive will need to be a minimum of 6"thick concc,ete to inolude a culvert <br /> c'ty Ma"a�e'' pipe for storm water drainage along with concrete mitered end sections at <br /> the culvert(both sides).There are similar driveways to the south ofyour <br /> LIiVDA D.BOAN site(east side of Copeland Dr.)that have the type of drive that we require. <br /> City Clerk http://www.dot.state.fl.us/rddesig;n/rd/rtds/08/51 S.pdf <br /> , • The driveway/turnout and culvert shail be in place prior to the issuance of <br /> JOSEPH A.POBLICK C.O. <br /> City Attomey • The appearance of the berm aIong Copeland Avenue is of continued <br /> concern.We recommend that the site be brought up to current(andscape <br /> code requirements.in lieu of ineeting the current code requirements the <br /> City recommends a maentanance program to keep the berm and <br /> surrounding area clean and presentable per your letter dated October 12, <br /> 2010. <br /> � Appiicant to suhmit"As-Built"site plans to the Planning Depardnent <br /> prior to issuance of C.O. <br /> f you have any questions please don't hesita.te to call. 813.780.0004 x3535 <br /> _ �.�__.. � ..._. ._...__ <br /> _._.., .. ... _. , <br /> ; .. <br /> " � ._..�_ � <br /> ssi r <br />
The URL can be used to link to this page
Your browser does not support the video tag.