AL L A C E O BCONTRACT#: I 306-15-300
<br /> ASSOCIA�CS, L,L,C, BONDREQUIRED: No
<br /> OENERAL CONTRACTOR8 CONTACT: Paul Pass
<br /> PHOWE; A f 3-247-4777
<br /> FAX: 8 I 3-9A0-0631
<br /> 5435 ML King Street North
<br /> St. Petersburg,Florida 33703
<br /> Phone:727-520-0700 Fax:727-520-0789
<br /> SUBCONTRACT AGREEMENT
<br /> This agreement made this ZO May 2013 by and between Cox Fire PrQtection.Inc.of 7910 Prnfessional
<br /> Place - -Tamoa.FL 33637 {hereinafter called "Subc;ontractor"), and Wallace Associfltes,L.L.C.,of St.
<br /> Petersburg,Floridu(heremafter called"Contrt�ctor").
<br /> WITNESSETH:
<br /> For and in considerAtion of payment to Sttbcontracror of the amount hereinafter described�nd the mutual
<br /> promises contained herein,Subcontractar and Contractor hereby agree as follows:
<br /> !(a). Tlee Work. Subc:ontractor shall provide and furnisli all labor, materiAls, touls, supplies,
<br /> equipment, services, facilities (including scaffolding And hoisting facilities unless specifically excluded
<br /> herein), Supervision, administration, etc. necessary for the proper and complete performance und
<br /> acceptance of the following:
<br /> Fire Sorinkler
<br /> (hereinafter called the "Work", all as more particularly described in Exhibit A attached hereta which is
<br /> hereby incorporated by reference) for the New Medical Ol�ice BuiMin for Fbrida Medical Clinic
<br /> (hereinaRer called the "Project") tocated at 36801 Eiland Blvd. -Ze h rl�ills Florida 33542- for FMC
<br /> Eiland LLC Joe Delatorre. Mana¢ine Partner(hereinafter called "Owner") according to the plans and
<br /> specifications(collectively,the"Specificntions")prepnred by Oliverl Architects-3Z707 U Hiehwav 19
<br /> N. - - Palm Harbor. FL 34684 (the "Architect" or the "Engmeer",as applicable), and the terms and
<br /> conditions of this Subcontract and the Prime ContracL This Subcontract includes, but is not limited ro, (�)
<br /> all amendments to this Subcontract entered pursuant to the provisians hereof; (ii) this Subc;ontract
<br /> document itself(including all Exhibits hereto),(iii)all addenda,(iv)Change orders issued pursuant hereto,
<br /> {v) the Specifications, as well as(vi) any and �Il other ducuments listed or referred to in this Subcontract.
<br /> This SubcontrACt, And All procedures �nd provisions hereof, shall govern all dealings and transacti�ns
<br /> between the parties arising in any way from the Project, irx;luding, but not lintited to, any extra work by
<br /> Subcontractor related to the Praject.(See Section 5).
<br /> 1(b). Prinre Co,rtract, Subcontractor hereby acknowledges that on Mav 9.2013, Contractor and
<br /> Owner entered into thflt certAin general construction contract (the "Prime Contrnct") whereby tlie
<br /> Contractor is required to furnish certain IAbor And materials and perform various construction activities in
<br /> accordance with the Prime ContracL The Prime ContrACt is incorporated herein by reference und made an
<br /> mtegral part of this Subcontract. The Prime Contract includes,but is not limited to,the agreement between
<br /> Contractor and Owner{including s�ll general and special terms and conditions),all addenda,modi�cations,
<br /> revisions, drawings, specifications,details, as well as any and All other documents listed or referred to in
<br /> the Prime Contract. Subcontractor is obligated and liable to Contractor to the full extent that Contractor is
<br /> obligated and liable uncler the Prime Contrlct to Owner for the Work. The Prime Contract And this
<br /> Subcontract shall be read And interpreted together. However, in cas� of any conflict or inconsistenc;y
<br /> between the Prime Contract and this Subcontract, this Subcontract shal{ govern the relationship between
<br /> Contractor and Subcontractor. Subcontractor represents and acknowledges that all documents comprising
<br /> the Prime Contrflct have been made avuilable to Subcontractor for its inspection and review, and
<br /> Subcontrnctor has satisfied itself as to the contents thereof. Subcontractor further represents that it h1s
<br /> previously notified Contractor in writing of any and all ambiguities, inconsistencies, and omissions within
<br /> the Prime Contract documents themselves, And any and all inconsistencies between such documents and
<br /> �3o6-i5-3�
<br /> Page 1 of l3
<br /> Sutxontron Agrcemcm(Long Fam)
<br /> Revixd 06l08/10
<br />
|