Subcantractor recognizes and agrees that As the Project progresses, the Schedule,(including both duration <br /> and sequences of activities shown thereon), mAy be amended by Contractor to reflect instructions from the <br /> Owner, changes in the Pro,ject, ch�nges in construction means or methods,and unanticipated occurrences <br /> affecting progress of the Project. Subcontractor agrees to comply with each and all such amendments to <br /> the Schedule, and to perform the Work in strict accordance with such amendments. At Contractor's <br /> request, and at the times specified in any such request, Subcontractar shail submit t�Contractor det�iled <br /> progress, procurement, pe��forntance, manpower, and completion schedules, satisfactory to Controctor. <br /> Subcontractor shall promptly increase its work force, work overtimt, work Sttturdays, Sundays and <br /> holidnys,all without additional compensation,if,in the opinion of Contractor,such measures are necessary <br /> to maintain pr�per progress of the Work in accordance with the Schedule. Except as expressly provided in <br /> Sections 4(b) and 5 below, Subcontractor waives and disciaims any remedy against Contractor for any <br /> daronges or costs arising from delays, accelerations, interferences, suspensions, or changes in the <br /> performance, duration or sequence of Subcontr�ctor's Work. Without limitation of the foregoing, no <br /> premium time will be paid except pursuant to written authorization by Contractor specifying thAt premium <br /> time wi{1 be paid,and the amount that will be paid. <br /> 4(b). Delays of the Work. If Subcontractor is delayed in the commencement, performance, or <br /> completion of the Work by: Change Ordeis issued by Conhactor in accordance with Section 5 below; <br /> extraordinnry weather conditions that are uncharacteristic for thc locnle of the Work and that could not <br /> hnve been anticipated; unusual und unanticipated delays in transportation; or unavoidable casualty loss to, <br /> or destruction of,the Work,then the Schedule described in 4(a)above may be adjusted by Contractor based <br /> on the reasonable amount of time lost as u result of such occurrence. Otherwise,Subcontractor assumes All <br /> risks of strict compliance with the Schedule. The adjustment of the Schedule provided for herein shall be <br /> Subc;ontractor's sole remedy for any and all interferences,suspensions,and delays. No such adjustment in <br /> the Schedule shall be made unless written notice containing n request therefore is given to Connactor <br /> within forty-eight (48) hours after commencement of the occurrence that causes such delay, regardless of <br /> whether or oat Contractor lias actut�l notice of the delay, and provided always tht�t a similar extension of <br /> time hAS been allotted to Contructor by Owner. Contrttctor shall have no dury, obligation, or liabitity to <br /> Subcontractor as a result of any delay, interference,suspension,or other event,except to seek an extension <br /> of time from the Owner as provided herein. <br /> 4(c). Liqr�idated Da�xages. Subcontractor represents that it has satisfied itself as to the extent and <br /> amount of any provision in the Prime Contract impc�sing liquidated damages upon Contrttctor, and <br /> acknvwledges that in the event Subc:ontractor fails to eomply with the Seheciule, and liquidated dam�ges <br /> are imposed by Owner on Contractor,such liquidated damages will constitute one element of the d�mnges <br /> that Contractor shttll be entitled to recover f'rom Subcontractor. <br /> S(�r}. Clra►eges in ll:e Work. Contractor may at any time, without nutice to any surety, direct <br /> changes,additions,and/or deletions in or to Subcontractor's Work,or direct extra worfc(all of the foregoing <br /> being referred to herein ns"Change(s)"). The Subcontract Price�►nd Schedule shalk be adjusted on account <br /> ot'Changes only as provided in 5(b)-(d) below. Otherwise,Subcontraclor shall receive no time extension <br /> or additionAl compensation on account of Changes. <br /> S{h). Cleange Orders. [Vo Change shall result in an adjustment �n the Subcontract Price or <br /> Schedule unless expressly directed by a Change Order made in strict compliance with this Section 5(b), <br /> prior to Si�bcantractor's commencement of perform�nce of the Change. A Change Order is: (i) a written <br /> order by Contractor, expressly designated as a Change Order, directing a Change in the Work, or (ii) an <br /> oral or wri[ten order (defined to include authorizations, directions, interpretations, or determination) by <br /> Contractor directing a Change in the Work, if,and only if, Subcontractor gives Contraetor written notice <br /> within three(3)calendar days after first receiving such order,stating the date,circumstances,and source of <br /> the order, and expressly st�ting that Subcontractor regnrds such order as requiring a Change in the Work. <br /> Provided,however, that such notice by Subcontractor shAll not result in a Change Order if the Contractor's <br /> order does not, in fACt, require a Change in the W�rfc. No other order by Contractor shall constitute � <br /> Change Order, ttnd Subcontractor sha(1 be entitled to no campensation or adjustment in the Schedule on <br /> account of any other order,whether or not it results in a ChAnge. <br /> 5(c). A�jristnse�rts r�i Sr�bcontraet Price. Prior to the issuance of any Change Order,Contractor <br /> may require Subcontractor to furnish promptly a detailed price breakdown showing the difference in value <br /> �3o6-is-3oo <br /> Page 4 of I l <br /> Sutx�ontraa Agrecmcnt(L.ong Form) <br /> Rcvised 06/08/10 <br />