Subcantractor recognizes and agrees that As the Project progresses, the Schedule,(including both duration
<br /> and sequences of activities shown thereon), mAy be amended by Contractor to reflect instructions from the
<br /> Owner, changes in the Pro,ject, ch�nges in construction means or methods,and unanticipated occurrences
<br /> affecting progress of the Project. Subcontractor agrees to comply with each and all such amendments to
<br /> the Schedule, and to perform the Work in strict accordance with such amendments. At Contractor's
<br /> request, and at the times specified in any such request, Subcontractar shail submit t�Contractor det�iled
<br /> progress, procurement, pe��forntance, manpower, and completion schedules, satisfactory to Controctor.
<br /> Subcontractor shall promptly increase its work force, work overtimt, work Sttturdays, Sundays and
<br /> holidnys,all without additional compensation,if,in the opinion of Contractor,such measures are necessary
<br /> to maintain pr�per progress of the Work in accordance with the Schedule. Except as expressly provided in
<br /> Sections 4(b) and 5 below, Subcontractor waives and disciaims any remedy against Contractor for any
<br /> daronges or costs arising from delays, accelerations, interferences, suspensions, or changes in the
<br /> performance, duration or sequence of Subcontr�ctor's Work. Without limitation of the foregoing, no
<br /> premium time will be paid except pursuant to written authorization by Contractor specifying thAt premium
<br /> time wi{1 be paid,and the amount that will be paid.
<br /> 4(b). Delays of the Work. If Subcontractor is delayed in the commencement, performance, or
<br /> completion of the Work by: Change Ordeis issued by Conhactor in accordance with Section 5 below;
<br /> extraordinnry weather conditions that are uncharacteristic for thc locnle of the Work and that could not
<br /> hnve been anticipated; unusual und unanticipated delays in transportation; or unavoidable casualty loss to,
<br /> or destruction of,the Work,then the Schedule described in 4(a)above may be adjusted by Contractor based
<br /> on the reasonable amount of time lost as u result of such occurrence. Otherwise,Subcontractor assumes All
<br /> risks of strict compliance with the Schedule. The adjustment of the Schedule provided for herein shall be
<br /> Subc;ontractor's sole remedy for any and all interferences,suspensions,and delays. No such adjustment in
<br /> the Schedule shall be made unless written notice containing n request therefore is given to Connactor
<br /> within forty-eight (48) hours after commencement of the occurrence that causes such delay, regardless of
<br /> whether or oat Contractor lias actut�l notice of the delay, and provided always tht�t a similar extension of
<br /> time hAS been allotted to Contructor by Owner. Contrttctor shall have no dury, obligation, or liabitity to
<br /> Subcontractor as a result of any delay, interference,suspension,or other event,except to seek an extension
<br /> of time from the Owner as provided herein.
<br /> 4(c). Liqr�idated Da�xages. Subcontractor represents that it has satisfied itself as to the extent and
<br /> amount of any provision in the Prime Contract impc�sing liquidated damages upon Contrttctor, and
<br /> acknvwledges that in the event Subc:ontractor fails to eomply with the Seheciule, and liquidated dam�ges
<br /> are imposed by Owner on Contractor,such liquidated damages will constitute one element of the d�mnges
<br /> that Contractor shttll be entitled to recover f'rom Subcontractor.
<br /> S(�r}. Clra►eges in ll:e Work. Contractor may at any time, without nutice to any surety, direct
<br /> changes,additions,and/or deletions in or to Subcontractor's Work,or direct extra worfc(all of the foregoing
<br /> being referred to herein ns"Change(s)"). The Subcontract Price�►nd Schedule shalk be adjusted on account
<br /> ot'Changes only as provided in 5(b)-(d) below. Otherwise,Subcontraclor shall receive no time extension
<br /> or additionAl compensation on account of Changes.
<br /> S{h). Cleange Orders. [Vo Change shall result in an adjustment �n the Subcontract Price or
<br /> Schedule unless expressly directed by a Change Order made in strict compliance with this Section 5(b),
<br /> prior to Si�bcantractor's commencement of perform�nce of the Change. A Change Order is: (i) a written
<br /> order by Contractor, expressly designated as a Change Order, directing a Change in the Work, or (ii) an
<br /> oral or wri[ten order (defined to include authorizations, directions, interpretations, or determination) by
<br /> Contractor directing a Change in the Work, if,and only if, Subcontractor gives Contraetor written notice
<br /> within three(3)calendar days after first receiving such order,stating the date,circumstances,and source of
<br /> the order, and expressly st�ting that Subcontractor regnrds such order as requiring a Change in the Work.
<br /> Provided,however, that such notice by Subcontractor shAll not result in a Change Order if the Contractor's
<br /> order does not, in fACt, require a Change in the W�rfc. No other order by Contractor shall constitute �
<br /> Change Order, ttnd Subcontractor sha(1 be entitled to no campensation or adjustment in the Schedule on
<br /> account of any other order,whether or not it results in a ChAnge.
<br /> 5(c). A�jristnse�rts r�i Sr�bcontraet Price. Prior to the issuance of any Change Order,Contractor
<br /> may require Subcontractor to furnish promptly a detailed price breakdown showing the difference in value
<br /> �3o6-is-3oo