My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
13-14513
Zephyrhills
>
Building Department
>
Permits
>
2013
>
13-14513
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 9:27:51 AM
Creation date
6/12/2014 9:27:43 AM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYR COMMONS
Building Department - Doc Type
Permit
Permit #
13-14513
Building Department - Name
SF ZEPHYR COMMONS LP
Address
7898 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
111
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mattress Firm <br /> Plan Review Comments: <br /> 1. F.F E. shall be a minimum 8" above road elevation or to the engineered site <br /> plan. <br /> 2. Tie-in survey required before pre-slab inspection to show elevation. <br /> 3. Compaction test required. <br /> 4. All setbacks shall be met. <br /> 5. Drainage Plan Requirements must be made before pre-slab inspection. <br /> Ordinance #974-07 Section 6. <br /> 6. All glazing requirements to be met per chapter 24 of the F.B.C. <br /> 7. All means of egress are to be per chapter 10 of the F.B.C. <br /> 8. No plumbing, mechanical, electric, or framing shatl be cover with inspection <br /> first. <br /> 9. Dumpster enclosure shall be inspected and signed of by Public Works Dept. <br /> Inspection and approval shall be done before any concrete is poured. <br /> 10. R.O.W. use permit required for all driveways and all driveways to include <br /> expansion materials. <br /> 11. All handicap and A.D.A. codes and requirement shall be met. <br /> 12. All welds, if any, shall be inspected by an independent engineering company, <br /> and a copy of their report shall be given to the building department. <br /> 13. All Architectural plans must be approved by the Planning Department. <br /> 14. All plumbing, mechanical, and electric shall be separate from unit to unit. This <br /> shall include underground plumbing and electric. <br /> 15. All signage shall require separate plans and permits and be done in <br /> accordance with Ordinance No. 870-04 <br /> 16. Address shall be ptaced on 301 side of building and Staples side. <br /> 17. Stormwater Pollution Prevention Plan required on site. <br /> 18. Suggest making fire wall 2 hours to satisfy future tenant requirements. <br /> 19. Separate permits required for all fire alarms, sprinklers ect.. <br /> F.F.E. — Finished Floor Elevation <br /> F.B.C. — Florida Building Code <br /> R.O.W. - Right Of Way <br /> A.D.A. - Americans with Disabilities Act <br />
The URL can be used to link to this page
Your browser does not support the video tag.