My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
13-14528
Zephyrhills
>
Building Department
>
Permits
>
2013
>
13-14528
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 9:40:56 AM
Creation date
6/12/2014 9:40:54 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
13-14528
Building Department - Name
REEDY,ELI
Address
5642 16TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ca .��!���ar� Roof ina, Inc. <br /> 15911 U.$. 3D1, Dade City, FL 33523 State Cert Rnofer#CCCI329�92 <br /> Ph: 800/562-2393 Fax: 352/567-4454 RCI Reg Roof Consultant #�I49 <br /> mil6arCearthlink.net <br /> ROOF PROPOSAL,aaqe� ot 2 <br /> DATE: 08/16/13 <br /> TO� REEDY, ELI & MCCOY DIANA PH. 813/267-022r <br /> 5642 16T"STREET elireedyCa�yahoo.corr <br /> ZEPHYRHILLS, FL 33542-4214 <br /> JOB: RESIDENCE <br /> 5642 16T"STREET <br /> ZEPHYRHILLS, FL 33542-4214 <br /> FLAT RE-ROOF <br /> 1 Tear off the existing flat roofing system down to the wood deck. <br /> 2 Re-fasten the existing plywood roof deck in accordance with the current Florida Building Code. <br /> 3. Provide and install pressure-treated wood nailer around perimeter of roof deck. <br /> 4 Provide and install new polyisocyanurate rigid insulation board <br /> 5 Provide and install a new Duro-Last 40 mil white roofing membrane which is a mechanically-attached roof system, <br /> the seams are heat-welded to form one sheet. Provide Duro-LasYs 15-year material warranty <br /> . x <br /> 6 Re-flash all penetrations using Duro-Last pre-formed flashings. <br /> 7. Provide and install Duro-Last 4" drip edge <br /> 8 Contract sum includes the replacement of 15 sheets of 3/4"x4'x8' sheets of CDX plywood Repair/Replacement of <br /> any additional damaged or deteriorated roof deck or repair/replacement of damaged/deteriorated fascia, trim, <br /> framing, etc. will be completed on a cost-plus basis above and beyond the contract price. <br /> 9. Owner is to: provide access to roof area for delivery trucks for loading/unloading of materials <br /> access to electricity. <br /> remove satellite dish prior to re-roofing and re-install on fascia. <br /> 10 MilBar Roofing, Inc. to provide General Liability and Worker's Compensation Insurance ($2,000,000 limit) and <br /> roofing permit. <br /> -----------------------------•------------------- <br /> We propose to furnish material and labor,complete in accordance with above specifications,for the Contract Sum of: <br /> AS STATED IN OPTIONS ON PAGE 2 <br /> -------------------------------------------------- <br /> Payment to be made as follows: 1/3 of contract sum due at slgning;1/3 due @ del of materials;balance due upon completion. <br /> ____________________________���'#¢41=�a=__________________________________�___________________ <br />
The URL can be used to link to this page
Your browser does not support the video tag.