My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
13-14562
Zephyrhills
>
Building Department
>
Permits
>
2013
>
13-14562
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2014 10:27:16 AM
Creation date
6/12/2014 10:26:53 AM
Metadata
Fields
Template:
Building Department
Company Name
CITY OF ZEPHYRHILLS
Building Department - Doc Type
Permit
Permit #
13-14562
Building Department - Name
CITY OF ZEPHYRHILLS
Address
38122 HENRY DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
114
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
July 26,2013 <br /> 190-ft Self Support Tower Structura/Modification Analysis CCl BU No 826548 <br /> TEP Project Number 48167.7359,Applicafion f 85469, Revision 4 Page 7 <br /> Table 6-Tower Component Stresses vs. Capacity <br /> Nates Component Elevation (ft) %Capacity Pass/Fail <br /> ;. <br /> 1 Anchor Rods <br /> ' - 43.6 Pass <br /> ._.__ ___. ___.. .__..___ _..—______.____,_..____.._.._.__.__._a_�_________._-�-_______ _____.—._._^. ___.._��__.______.� <br /> 1 Base Foundation Soil Interaction , - ' 89.5 Pass <br /> _ _.____.. .._.__ .---._ _..____---. .__.., _. ._..__.___.. ..__..._._�. __..:.--.-.--_.._____..___. _..._.._.__._�__...,.. __ _..---.. .__. .._____. <br /> 1 Base Foundation Structural - 30.8 Pass <br /> Structure Rating(max from al!components) = 96.3°k <br /> Notes: <br /> 1) See additional documentation in"Appendix C-Additional Calculations"for calculations supporting the%capacity listed. <br /> 4.1) Recommendations <br /> 1) If the load differs from that described in Tables 1 and 2 of this report, "Appendix B— Base Level <br /> Drawing" or the provisions of this analysis are found to be invalid, another structural analysis <br /> should be performed. <br /> 2) The modifications depicted in "Appendix D —Structural Modification Drawings"shall be installed <br /> and, upon completion, inspected. The tower and its foundation have sufficient capacity to carry <br /> the existing and proposed loads once the proposed modifications are installed. <br /> tnxTower Report-version 6.0.4 0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.