Laserfiche WebLink
PANEL' <br />AG <br />II 15 Iq <br />10 I <br />� 11 <br />12 <br />PANEL 'PANEL I�O a D <br />LB LA <br />NEW POWER <br />CONDITIONER <br />FURN15HED BY <br />ELECTRICAL 18 VARIAN, <br />CLOSET IN5TALLED BY <br />CONTRACTOR <br />PONER RISER P I AORAM <br />NO 5CALE <br />NOTE: NO NEW LOAD 15 ADDED TO THE <br />EXISTING 5ERVIGE <br />LINE LEGEND <br />- — — - EXISTING TO BE REMOVED <br />EXISTING TO REMAIN <br />NEW <br />0 <br />O EXISTINO 20OA/3 -POLE D156ONNEGT 5WIT6H TO REMAIN. <br />!O EX15TINO PANEL FEEDER TO REMAIN. <br />II EX15TINO 4 #310, 1 #6 E.G. IN 2 -1/2" CONDUIT FOR ACCELERATOR <br />BREAKER TO BE MODIFIED. <br />12 EXISTING 150 AMP, 3 -POLE BREAKER IN FLUSH MOUNTED ENCLOSURE <br />TO BE RECONNECTED A5 SHOWN. MAINTAIN EXISTING UNDER VOLTAGE <br />RELAY AND CIRCUITRY. <br />13 EX15TINO 200A/3 -POLE DISCONNECT 5WITGH TO REMAIN, LABEL AS <br />"MAIN #5 ". <br />14 EXISTING 20OA/ 3 -POLE DISCONNECT 5WITGH TO REMAIN, LABEL A5 <br />"MAIN #6 ". <br />15 PROVIDE NEW SPLICE BOX ABOVE CEILING, MINIMUM 20" x 20" x 6" <br />DEEP. REDIRECT FEEDER A5 INDICATED. GAP NEUTRAL CONDUCTOR <br />AND TERMINATE WITHIN BOX. <br />I6 PROVIDE 3 #3/0,1 #6 E.G. IN 2 -1/2" CONDUIT TO NEW POWER <br />CONDITIONER IN DE- COMM155IONED 51MULATOR ROOM. <br />1 PROVIDE 4 #3/0,1 #6 E.G. IN 2 -1/2" CONDUIT TO EX15TINO <br />ACCELERATOR MAIN BREAKER. <br />18 EXI5TIN0 FEEDERS TO ACCELERATOR EQUIPMENT TO REMAIN. <br />IG COORDINATE HALL PENETRATIONS INTO 1;1E- COMMI5510NED 51MULATOR <br />ROOM AND CONDUIT ROUTING WITH GENERAL CONTRACTOR PRIOR TO <br />ROUGH - I N. <br />® NEW TRANSTEGTOR MODEL #BBLX- 50K- -70OA/V5 POWER CONDITIONER. <br />UNIT 15 EQUIPPED HITH INTEGRAL ISOLATION TRANSFORMER, <br />20OA/3 -POLE INPUT BREAKER, AND 1 -75A/3 -POLE OUTPUT BREAKER. <br />N4A <br />Date: <br />NOTE5 <br />K <br />E <br />lO <br />EXI5TIN0 TWO 3" CONDUITS WITH 4 #350 MGM GU IN EACH TO REMAIN. <br />Y <br />O2 <br />EX15TINO METER EN61-050RE TO REMAIN. <br />07-23 -13 ' <br />J <br />EXI5TIN0 WIREWAY (NEMA 3R) TO REMAIN. <br />� <br />U4 <br />EXISTING 5ERVIGE GROUND TO REMAIN. <br />Drawing No: <br />�� <br />EXISTING LIGHTNING ARRESTOR TO REMAIN. <br />0� <br />© <br />EX15TINO 20OA/3 -POLE DI5CONNECT 5WITGH TO REMAIN, "MAIN #1". <br />N <br />Z <br />U7 <br />EXISTING 20OA/3 -POLE DISCONNECT 5WITGH TO REMAIN, "MAIN #2 ". <br />O <br />8O <br />EXISTING 20OA/3 -POLE DISCONNECT SWITCH TO REMAIN, "MAIN #3 ". <br />u <br />PROVIDE NEW 200 AMP, RK -1 FU5E5 AND GLA55 'R' REJEGTION GLIPS. <br />O EXISTINO 20OA/3 -POLE D156ONNEGT 5WIT6H TO REMAIN. <br />!O EX15TINO PANEL FEEDER TO REMAIN. <br />II EX15TINO 4 #310, 1 #6 E.G. IN 2 -1/2" CONDUIT FOR ACCELERATOR <br />BREAKER TO BE MODIFIED. <br />12 EXISTING 150 AMP, 3 -POLE BREAKER IN FLUSH MOUNTED ENCLOSURE <br />TO BE RECONNECTED A5 SHOWN. MAINTAIN EXISTING UNDER VOLTAGE <br />RELAY AND CIRCUITRY. <br />13 EX15TINO 200A/3 -POLE DISCONNECT 5WITGH TO REMAIN, LABEL AS <br />"MAIN #5 ". <br />14 EXISTING 20OA/ 3 -POLE DISCONNECT 5WITGH TO REMAIN, LABEL A5 <br />"MAIN #6 ". <br />15 PROVIDE NEW SPLICE BOX ABOVE CEILING, MINIMUM 20" x 20" x 6" <br />DEEP. REDIRECT FEEDER A5 INDICATED. GAP NEUTRAL CONDUCTOR <br />AND TERMINATE WITHIN BOX. <br />I6 PROVIDE 3 #3/0,1 #6 E.G. IN 2 -1/2" CONDUIT TO NEW POWER <br />CONDITIONER IN DE- COMM155IONED 51MULATOR ROOM. <br />1 PROVIDE 4 #3/0,1 #6 E.G. IN 2 -1/2" CONDUIT TO EX15TINO <br />ACCELERATOR MAIN BREAKER. <br />18 EXI5TIN0 FEEDERS TO ACCELERATOR EQUIPMENT TO REMAIN. <br />IG COORDINATE HALL PENETRATIONS INTO 1;1E- COMMI5510NED 51MULATOR <br />ROOM AND CONDUIT ROUTING WITH GENERAL CONTRACTOR PRIOR TO <br />ROUGH - I N. <br />® NEW TRANSTEGTOR MODEL #BBLX- 50K- -70OA/V5 POWER CONDITIONER. <br />UNIT 15 EQUIPPED HITH INTEGRAL ISOLATION TRANSFORMER, <br />20OA/3 -POLE INPUT BREAKER, AND 1 -75A/3 -POLE OUTPUT BREAKER. <br />N4A <br />Issued for. <br />Date: <br />N <br />N <br />� <br />W <br />I <br />� <br />❑ BIDDING <br />EHAYEB <br />NO. 9521 <br />� M <br />07-23 -13 ' <br />❑ CONSTRUCTION <br />� <br />w <br />Q <br />Drawing No: <br />moo <br />, E-3 <br />0� <br />N <br />Z <br />0 <br />Z <br />^N <br />O <br />W <br />N <br />u <br />F 00 <br />o <br />0 <br />�w <br />x <br />a <br />Issued for. <br />Date: <br />❑ PRELIMINARY <br />❑ PRICING <br />❑ BIDDING <br />EHAYEB <br />NO. 9521 <br />■ PERMIT <br />07-23 -13 ' <br />❑ CONSTRUCTION <br />�., <br />or Project N <br />coo <br />Drawing No: <br />, E-3 <br />a <br />Co Co <br />W <br />M N <br />w <br />�w <br />m <br />V <br />Q <br />r <br />Oz <br />Q <br />_� <br />UJ o <br />tn <br />_ <br />U <br />U <br />o <br />0. <br />w <br />O <br />N <br />M <br />N <br />d <br />J <br />Issued for. <br />Date: <br />❑ PRELIMINARY <br />❑ PRICING <br />❑ BIDDING <br />EHAYEB <br />NO. 9521 <br />■ PERMIT <br />07-23 -13 ' <br />❑ CONSTRUCTION <br />or Project N <br />Co <br />W <br />F" <br />O <br />Z <br />0 <br />Z <br />Q <br />G <br />Q <br />Q <br />Ix <br />W <br />Co <br />WW <br />O <br />a. <br />o� <br />O <br />w <br />0 <br />Q <br />Q <br />z <br />a <br />W <br />w <br />O <br />t� <br />V <br />W u <br />V m <br />_O <br />Q Q <br />0 <br />V � <br />a <br />J <br />N <br />M <br />Seal <br />50UHEI <br />6CEN <br />EHAYEB <br />NO. 9521 <br />or Project N <br />3-10 6 <br />Drawing No: <br />, E-3 <br />Drawn by T.M. <br />Checked by, S.C. <br />i <br />N <br />ti <br />O <br />W <br />D <br />W <br />Q <br />0 <br />W <br />W <br />a <br />