UN OI N
<br /> �nNS can�a,nnn
<br /> RoofinA
<br /> Slopes of less than 3"on 12"are not recommended. For slopes of 3"on 12'or greater,end lap panels 6"Side laps should face
<br /> away from the prevailing wind. Lay the first sheet along the eave at the down-wind side of the roof,farthest away from the
<br /> direction of the prevailing winds(See Figure#4}, Install sheets in the sequence shown in Figure#4.
<br /> Fiaure#4 Fiaure#5-Installation O s�tions
<br /> Prerailin9
<br /> /�nds Option t O tion 2 O tion 3
<br /> ✓
<br /> , � (" ;�;l f."",��`�`?;�'�� w�..
<br /> . ;z;r��ra�,��� �� �``�:.�;i:c�'„ r 2"x4's
<br /> �,•:�„�'��",,�;,`;d�\�,:.'.;��% t:;';;�.,
<br /> ;1�:r::\a�aa\���c;�\\;,`z'iv.�P7:'��;�.
<br /> \.°�v;;�.•, ,��:;i;.��t,"�':�; �f�.'''�`
<br /> `';\�����,',,�,,`;y1 t,��;�,�� , 2'Spaci�g Union�BSynthetic Union�@HSynthetic
<br /> '� ��\�;,�,:��;i':�";�., �;':
<br /> ��� ;,^�',�„,,,�',�.;j�,, "� 1;+ry"� Unded M
<br /> `P'�i���� '•p...,,�,,i.,�y�y'� .A,`�.Si;;l\. ,: .,;\�p Ut1C�2f� R12nt
<br /> \�.i. i�,' ,�,'�\,n�, `�p ":e �:"y,�`��; . ,
<br /> 'rc��,�\'t��;''.1�i,w��;.'��;.;5,`1��.,�i'"*��;'��.,, ::R4`,.\�.�� '��£
<br /> \4`,
<br /> ����a �",i d` ��, +.� � . �l����1r e.S S
<br /> �n 6"WPZ lt�t c�t \,�$, �'"+ ��\�� �� �`�:
<br /> `� ��°���,�,,"��"�; ��,,�';", ,:i�� � ��{'�� Install Metal Directly
<br /> � . '�,'�",;�,�,.�:;;���� �� �•;:,,,,�':�� �. tnstall Meta!on Install Metal Over
<br /> , � ;:
<br /> ������ �,��`;��''' `; ��''''''`' �"'` `�`�''��`s; to Wood Frame Solid Deck Existing Shingles
<br /> ,��' „.,,��.;,,�,', �,v�� �u � ��� ,�
<br /> ` ;^ ' "�"�^1', ;',�:�'':�` •Use Maximum 2'Purlin S cin
<br /> ,;,;�, }�\'� ,'�. 3 d.. '' �a" pa g •La PI ood Deck •A 1
<br /> � �-`; `,;, y yw pp y Union�EPEL Synthetic
<br /> `�a`'� ,:r�'',�'�;�„ �`���,.;{, �`c'r'�
<br /> ;.'Lt:,,..,.,�?,::°'';.�;;;;,�.V„�;;;;,;��' •Install Metal -Appty Union�Synthetic Underlayment or other
<br /> `��!��?;'�'':��`��'`�`�' 1 J *DO NOT USETHIS OPTION fOR Underlayment or other Moisture Barrier Protection
<br /> HEATED SPAtES UIVLESS INSULATION Moisture Barrier Protection •Install Metal
<br /> Maximum Purlin Spacing for AND MOISTURE BARRIER PROTE- •Install Metal
<br /> Roof 2'on Center TtON IS USED
<br /> *Proper ventilation and vapor barrier protection recommended for heated spaces
<br /> Allow an overhang a minimum of 1"at the eave to provide for a drip edge. Use inside closure at eave to prevent water infiltra-
<br /> tion,insect or bird infestation at openings.To protect against uplifting winds and to provide a finished appearance,apply rake
<br /> trim or other standard gable trim. For slopes less than 3:12,apply 3/8"tape sealant as shown in Figure#6 along the top of all
<br /> lap ribs. Do not block the siphon channel with the tape. For best results,apply a 7/8"lap tek screw into the crown of the rib to
<br /> secure the side lap.
<br /> Figure#6-Proper Apulication of Side Lap Tape
<br /> 7/8'Lap Tek Screw at 24"O.C.
<br /> 3/8"Butyl7ape Sealant
<br /> Allowable Uniform Loads Per Square Foot
<br /> LIVE LOAD (PSF) WIND LOAD (PSF)
<br /> SPAN oNCHESa 18" 24" 30" 36" 48" 54" 18" 24" 30" 36" 48" 54"
<br /> 29 Gau e 199 112 71 49 28 22 211 118 76 52 29 23
<br /> 26 Gauge 268 150 96 67 37 29 276 155 99 69 38 30
<br /> NOTES:
<br /> 1.Theoretical allowable loads are based on section properties and allowables calculated in accordance with 2007 AISI Specifications.
<br /> 2.Theoretical allowable Ioads are based on three or more uniform spans.
<br /> 3. For roof panels,deduct self weight for actual'live load'capacity of the panel.
<br /> 4.These loads are for panel strength.Frames,purlins,decks and fasteners must be designed to resist all loads imposed on the panel.
<br /> 5.Check local building codes if panel testing is required.
<br /> �
<br />
|