Laserfiche WebLink
.�,; <br /> 38609 11t''Ave Zephyrhills, Florida 33542 <br /> 1. A 3 foot wide strip of concrete will be added to the end of the driveway to allow a slight incline <br /> ramp for the shed opening(8 X 8 roll up door) and a pad of concrete will be placed for the shed <br /> to be constructed on top. Pad will be made to code with footers and steel reinforcement with <br /> termite treatment applied as required. <br /> 2. The 20 X 20 steel insulated shed (see attached materials for shed)will be constructed about <br /> where the blue shaded area is located (not to correct ratio and size). It does not infringe on any <br /> set back requirements on the property. <br />