My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
13-14627
Zephyrhills
>
Building Department
>
Permits
>
2013
>
13-14627
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 10:35:14 AM
Creation date
7/24/2014 10:35:13 AM
Metadata
Fields
Template:
Building Department
Company Name
AUTOZONE INC DEPT 8088
Building Department - Doc Type
Permit
Permit #
13-14627
Building Department - Name
AUTOZONE INC DEPT 8088
Address
5350 GALL BLVD
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
TRINITY ERD <br /> 5.11 Metal edge attachment (except gutters), shail be designed and installed for wind loads in <br /> accordance with FBC Chapter 16 and tested for resistance in accordance with ANSI/SPRI ES-1 <br /> or RAS 111, except the basic wind speed shall be determined from FBC Figure 1609. <br /> 5.12 All products in the roof assembly shall have quality assurance audit in accordance with the FBC <br /> and F.A.C. Rule 9N-3. <br /> 6. INSTAILATION: <br /> 6.1 Duro-Last roof covers shall be installed in accordance with Duro-Last published installation <br /> instructions, subject to the Limitations/ Conditions of Use noted herein. <br /> 6.2 System attachment requirements for wind load resistance are set forth in Appendix 1. "MDP" _ <br /> Maximum Design Pressure is the result of testing for wind load resistance based on allowable <br /> wind loads. Refer to FBC 1609.1.5 for determination of design wind pressures. <br /> 6.3 "MDP" = Maximum Design Pressure in Appendix 1 reflects the ultimate passing pressure divided <br /> by 2; the 2 to 1 margin of safety per FBC 1504.9 has already been applied. <br /> 6.4 For mechanically fastened membrane systems (Type D) over profiled steel deck, membrane shall <br /> be installed running perpendicular to steel deck flutes. <br /> 7. BUILDING PERMIT REQUIREMENTS: <br /> As required by the Building Official or Authority Having Jurisdiction in order to y�roperly evaluate the <br /> installation of this product. <br /> 8. MANUFACTURING PLANTS: <br /> Contact the named QA entity for manufacturing facilities covered by F.A.C. Rule 9N-3 QA requirements. <br /> 9. QUALITY ASSURANCE ENTITY: <br /> UL, LLC. — QUA9625; (414) 248-6409; karen.buchmann@us.ul.com <br /> - THE 21-PAGES THAT FOLLOW FORM PART OF THIS EVALUATION REPORT- <br /> Exterior Research and Design,LLC. <br /> C'ertiffcat�e ofAuthorisaHon�9503 Evaluation Report D9750.05.08-R5 <br /> FL1559-R8 <br /> Revision 5: 02/15/2013 <br /> Page 4 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.