UNION
<br /> ����
<br /> Roofina
<br /> Slopes of less than 3"on 12°are not recommended. For slopes of 3"on t 2"or greater,end lap panels 6". Side laps should face
<br /> away from the prevailing wind. Lay the first sheet along the eave at the down-wind side of the roof,faPthest away from the
<br /> direction of the prevailing winds(See Figure#4). Instalt sheets in the sequence shown in Fgure#4.
<br /> Figure#4 Figure#5-Instaltation Options
<br /> Prevailing
<br /> /w�r,a5 Option 1 O tion 2 O tion 3
<br /> r�''
<br /> ,, �� ,•,�;�,,` ;,,\.�u r z,x4,5 w�
<br /> 4�'�'�.;,��r �;,,,�� �;,''.�q,,..�,;;;
<br /> �. ,�, �I:d\'„ �:`;�: tla�
<br /> �%�'',�.1���F,', ,,,'��.�;9;t�., 2'Spacing
<br /> ;�(�. ,c�\; '��';'h�+,�d'?%, Union�BSynthetic Union�@HSynthetic
<br /> ;�°2;; �s 3`�„'"r,,.`� �.r,,, Underl nt Underla ment
<br /> ��S„d;;�;; �;�:, , .. .,¢ ,,., ^a'
<br /> 'Y�1�+�.�k,\�^; '���',:.�;,r�"�;;,$':'. �ky�
<br /> M`�6�LaPZ � i�� i� �.3� �,`�.,k 7 � �"a,��-
<br /> �,�,;';����''''1`� �` �`�`��,�• Install Metal Directly install Metal on Instali Metal Over
<br /> \.,�;, ;;�_, ;.��;�`,,3;"'1�.;,�� � ` � to Wood Fr Solid Deck
<br /> �",:, ' ,, , a,,,?�`� ame Existing Shingles
<br /> '���� 'i+` �, � - ��';� ,� •UseMaximum2'P
<br /> 4,',:���.;'';?; urlin Spacing •Lay Plywood Deck •Apply Union RE�EL Synthetic
<br /> :. , �;a�,')i.;''`�.';
<br /> `�� �° ;'a •Install Metal •Apply Union oElEL Synthetic Underlayment or other
<br /> ,�?;'� ~°� "DO NOT USETHIS OPTION FOR Underlayment or other Moisture Barrier Protection
<br /> HEATED SPACES UNLESS INSULATION Moisture Barrier Protection •Install Metal
<br /> Maximum Purlin Spacing for AND MOISTURE BARRIER PROTE- •Install Metal
<br /> Roof 2'on Center TfON IS USED
<br /> *Proper ventilation and vapor barrier protedion recommended for heated spaces
<br /> Allow an overhang a minimum of 1"at the eave to provide for a drip edge. Use inside closure at eave to prevent water infiltra-
<br /> tion,insect or bird infestation at openings.To protect against uplifting winds and to provide a finished appearance,apply rake
<br /> trim or other standard gable trim. For slopes less than 3:12,apply 3/8"tape sealant as shown in Figure#6 along the top of all
<br /> lap ribs. Do not block the siphon channel with the tape. For best results,apply a 7/8"lap tek screw into the crown of the rib to
<br /> secure the side lap.
<br /> Fiaure#6-Proper Application of Side Lap Tape
<br /> �7/8'LapTek Saew at 24"O.C.
<br /> 3/8°Butyl Tape Sealant
<br /> Allowable Uniform Loads Per Syuare Foot
<br /> L1VE LOAD (PSF} WIND LOAD {pSF)
<br /> SPAN oNCHES> 18" 24" 30" 36" 48" 54" 18" 24" 30" 36" 48" 54"
<br /> 29 Gau e 799 112 71 49 28 22 211 178 76 52 29 23
<br /> 26 Gauge 268 150 96 67 37 29 276 155 99 69 38 30
<br /> NOTES:
<br /> 1 Theoretical allowable loads are based on section properties and allowables calculated in accordance with 2001 AISI Specifications.
<br /> 2.Theoretical allowable loads are based on three or more uniform spans.
<br /> 3.For roof pane�s,deduct self weight for actual`live load'capacity of the panel.
<br /> 4.These loads are for panel strengih. Frames,purlins,decks and fasteners must be designed to resist all loads imposed on the panel.
<br /> 5.Check local building codes if panel testing is required.
<br /> :'�