My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
13-14644
Zephyrhills
>
Building Department
>
Permits
>
2013
>
13-14644
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/24/2014 10:49:45 AM
Creation date
7/24/2014 10:49:44 AM
Metadata
Fields
Template:
Building Department
Building Department - Doc Type
Permit
Permit #
13-14644
Building Department - Name
WILSON,JACK & LINDA
Address
39609 QUARTZ DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- . � <br /> � ► <br /> , �� <br /> Procedure for Lot Improvement Requests <br /> (Please refer to "Rules and Regulations') <br /> 1. All requests aze to go to Chairman of the Property Evaluation Committee, for the committee <br /> to review. There is a holder labeled "ProDertv Evaluation & Improvements"in the librarv <br /> for Lot owners to place their comaleted forms in and these forms will be nicked�n from <br /> the Librarv bv the Pro�ertv Eva�uation committee. <br /> 2. Any request which is NOT filled out properly or in detail, which includes, complete plan <br /> layout, elevations {where applicable), written details of improvement bei.ng requested, including <br /> color, etc, and any other information pertinent to the processing of the request,will be ret�ned <br /> to the Lot own�er for com�let�og befbre beia�reviewed bv the Committee. <br /> 3. Committee will review requests and visit the site of the request as necessary. <br /> 4. After the Committee has approved or denied the request, it will be presented to the Board of <br /> Directors for their approval or denial. <br /> 5. There will be NO more one day approvals or last minute approvals. Request will take 7 - 14 <br /> days for appropriate review and consideration, thus giving the Committee and Board members <br /> time to review and consider the request in a thorough manner. <br /> 6. The origina] request will be stamped approved or denied, and after being copied the original <br /> vKill go into to the members file and the copy returned to the Lot owner by the Board of Director <br /> liaison to the committee. <br /> 7. The committee will follow up on requests to determine �e request as presented and <br /> approved is being adhered to. �Cr��%� `_ , <br /> � ��. _. {� � �. ,- � � <br /> t� ,r � �� � � <br /> � �� <br /> � ����y�� �,� fls �L 3���0 <br /> As the owner of Lot� I understan�thc rror�rty Evaluati�n Committee and/or the <br /> Board of Dire�tors will enter the property to follow the external progress of the construction or <br /> improvement, as submitte� on�e Lot Improvement Request. <br /> ' �� � � <br /> � � �` 7 z-�==l � <br /> ,--r. � . r� �,; -t� <br /> Lot Owner's Signature Da <br /> f � ��° 6�- . �, <br /> 4/03/06 � � �,�i'`- �°� � ��° � � ��� ...� .�. �� ��f' , r_�.� <br /> ��. <br /> ( t �`� °` �` � '� ` �`�� � .... ,'� �r;`°�� R�, <br /> � `(. �� Fi f�,� � c '�' __ a. 1 <br /> F <br /> R ! <br /> � � <br /> ` F <� �(� P--�!' r n <br /> ��t� �-li �} �' ..�'-f�.i '�"s �- �A`� �, <br /> ! � � ` <br /> , ��� <br /> � <br />
The URL can be used to link to this page
Your browser does not support the video tag.