Laserfiche WebLink
Tf�ll'�IIT'Y' ERC? <br /> Table 1: Roof Cover Options <br /> Asphalt Foam-On WO°d <br /> Underlayment Shingles Nail-On Tile T11e Metal Shakes& Slate <br /> Shingles <br /> Elastobase Yes Yes No Yes Yes Yes <br /> Elastobase P Yes Yes No Yes Yes Yes <br /> Polystick MTS Yes Yes No Yes Yes Yes <br /> Polystick IR-Xe Yes No No No Yes Yes <br /> Polystick TU Yes Yes See SS4 1 No Yes Yes <br /> Polystick TU P Yes Yes See 554.1 No Yes Yes <br /> Polystick TU Plus Yes Yes See 554.1 Yes Yes Yes <br /> Polystick TU Max No Yes See 554 1 No No No <br /> Dual Pro Yes Yes No Yes Yes Yes <br /> Tile Pro Yes Yes See 554.1 Yes Yes Yes <br /> Elastoflex S6 G Yes Yes See 554.1 No Yes Yes <br /> Elastoflex 56 G FR Yes Yes No No Yes Yes <br /> Polyflex G Yes Yes See 554 1 No Yes Yes <br /> Polyflex G FR Yes Yes No No Yes Yes <br /> Polyflex SAP or SAP FR Yes Yes See 554 1 No Yes Yes <br /> Mule-Hide SA-APP Cap Sheet yes Yes Yes No Yes Yes <br /> or SA-APP Cap Sheet(FR) See 5 4 1 <br /> 5.4.1 "Foam-On Tile" is limited to use of the following Approved tile adhesives unless tensile <br /> adhesion / long term aging data from an accredited testing laboratory is provided. <br /> ;- Polyfoam PolyPro AH160: Polystick TU, Polystick TU P, Polystick TU Plus, Elastoflex 56 <br /> G, Polyflex G, Polyflex SAP, Polyflex SA Cap FR, Mule-Hide SA-APP Cap Sheet or Mule-Hide <br /> SA-APP Cap Sheet (FR) or Tile Pro. <br /> ➢ 3MT"' 2-Component Roof Tile Adhesive AH-160: Polystick TU Max <br /> > Dow TileBond: Polystick TU P, Polystick TU Plus, Polyflex SAP or Tile Pro <br /> Y Convenience Products' Touch 'n Seal StormBond Roof Tile Adhesive: Polystick TU <br /> Plus, Polystick TU Max <br /> 5.4.2 For nail-on tile systems over Polystick MTS, battens are required for loading / staging of the <br /> tile. <br /> 5.4.3 A 2-ply underlayment system, consisting of Polystick MTS followed by Polystick MTS, TU, TU <br /> P, TU Plus or TU Max, or Polyflex SAP is allowable for use under mechanically attached <br /> prepared roof systems. This is not a requirement, but is allowable if a 2-ply underlayment <br /> system is desired. <br /> Exterior Research and Design, LLC. Evaluation Report P12060.02.09-R13 <br /> Certificate of Aulhorization�9503 FL5259-R18 <br /> Revision 13: 04/26/2013 <br /> Page 4 of 10 <br />