Laserfiche WebLink
TR.I�JITY ERD <br /> 6.7 Tile Staaina: <br /> 6.7.1 Tile shall be loaded and staged in a manner that prevents tile slippage and/or damage to the <br /> underlayment. Refer to Polyglass published requirements for tile staging. <br /> 6.7.2 Battens and/or Counter-battens, as required by the tile manufacturer and FRSA/TRI 07320/8- <br /> 05 must be used on all roof slopes greater than 7:12. Precautions should be taken as <br /> needed, such as the use of battens or nail-boards, to prevent tile sliding and/or damage to <br /> the underlayment during the loading process. <br /> 6.7.3 For nail-on tile systems over Polystick MTS, battens are required for loading / staging of the <br /> tile. <br /> 6.7.4 The minimum cure time after installation of self-adhering membranes and before loading of <br /> roofing tiles is forty-eight (48) hours. <br /> 7. LABELING: <br /> Each unit shall bear a permanent label with the manufacturer's name, logo, city, state and logo of the <br /> Accredited Quality Assurance Agency noted herein. <br /> 8. BUILDING PERMIT REQUIREMENTS: <br /> As required by the Building Official or Authority Having Jurisdiction in order to properly evaluate the <br /> installation of this product. <br /> 9. MANUFACTURING PLANTS: <br /> Contact the noted QA agency for information on product locations covered for F.A.C. Rule 9N-3 QA <br /> requirements. <br /> 10. QUALITY ASSURANCE ENTITY: <br /> UL, LLC - QUA9625; (314) 578-3406; k.chancellor@us.ul.com <br /> - END OF EVALUATION REPORT- <br /> Exterior Research and Design, LLC. Evaluation Report P12060.02.09-R13 <br /> Certifcate ofAutho�ization ax9503 FL5259-R18 <br /> Revision 13: 04/26/2013 <br /> Page 10 of 10 <br />