Laserfiche WebLink
i l 1 � <br /> c <br /> c � <br /> ICC-ES Evaluation Report ESR-1601* <br /> Reissued September 1, 2012 <br /> This repo►f is subject to renewa/November 1, 2014. <br /> www.icc-es.orq � (800)423-6587 � (562)699-0543 A Subsidiary of the Intemationa!Code Council� <br /> DMSION:07 00 00—THERMAL AND MOISTURE instructions. The manufadurer's published installation <br /> PROTECTION insVuctions must be available at the jobsite at all times <br /> Section:07 30 05—Roofing Felt and Underlayment during installation. <br /> REPORT HOLDER: Prior to application of the underlayment, the roof deck <br /> surface must be free of frost,dust and dirt,loose nails,and <br /> ALPHA PROTECH ENGINEERED PRODUCTS,INC. other protrusions.Damaged sheathing must be replaced. <br /> 301 SOUTH BLANCHARD STREET Installation of an approved roof covering can proceed <br /> VALDOSTA,GEORGIA 31601 immediately following application of the roofing <br /> (229)242-1931 underlayment. The unde�layment is to be cover�ed by the <br /> www.alahaarotech.co_m roof covering within the time set forth in the underlayment <br /> manufacturers published installation instrudions. For <br /> EVALUATION SUBJECT: reroofing applications, the same procedures apply after <br /> removal of the existing roof covering and roofing felts to <br /> REXTM SYNFELT, REXTREME AND TECHNOPLY expose the roof dedc. <br /> SYNTHETIC ROOF UNDERLAYMENTS 4.2 Applications: <br /> 1.0 EVALUATION SCOPE The underlayment must be installed in axordance with <br /> Compliance with the following codes• Chapter 15 of the IBC or Chapter 9 of the IRC, and must <br /> � be laid printed side up horizontally (parallel to the eave) <br /> ■ 2012,2009 and 20061ntemational8uilding Code�(IBC) starting at the lower edge of the roof, with 3-inch(76 mm) <br /> ■ 2012,2009 and 2006 Intemational Residentia!Code� horizontal (head) laps and 6-inch {152 mm) vertical (end) <br /> QRC) laps. <br /> Properties evaluated: The underlayment must be fastened to the roof deck <br /> using minimum No. 12 gage [0.109-inch (2.77 mm)] <br /> ■ Physical properties minimum shank diameter, corrosion-resistant roofing nails <br /> ■ Fire classification having minimum 1-inch-diameter (25.4 mm) plastic caps. <br /> 2.0 USES The fasteners must be spaced 8 inches (203 mm) on <br /> c�nter at vertical and horizontal laps, and 24 inches <br /> REXTM' SynFelt, REXtreme and TECHNOpIy synthetic (610 mm) on center vertically and horizontally in a <br /> roofing underlayments are altematives to the ASTM D226, staggered pattem in the fiefd of the underlayment, except <br /> Type I and Type II, roofing underlayment specified in in areas subject to high winds where underlayment <br /> Chapter 15 of the ISC and Chapter 9 of the lRC. The fastening must comply with high wind attachment <br /> underlayments are also used as components of classified requirements speafied in IBC Section 1507 or IRC Section <br /> roofing assemblies when installed as described in this R905. Fasteners must be long enough to penetrate into the <br /> report. sheathing a minimum of 3/a inch (19.1 mm) or through the <br /> 3.0 DESCRIPTION sheathing, whichever is less. When battens are installed <br /> over the underlayment, the undehayment need only be <br /> The roof underlayments consist of a woven polypropylene preliminarily attached pending attachment of the battens or <br /> fabric with a polypropylene coating on each side. The counterbattens. <br /> REXTM SynFelt, REXVeme and TECHNOpIy synthetic <br /> underlayments have nominal weights, respedively, of 2.56 A single layer of minimum 24-inch-wide (610 mm) <br /> pounds per 100 square feet (125 glm2), 2.97 pounds per underlayment must be installed and centered vertically at <br /> 100 square feet (145 g/m2), and 2.05 pounds per 100 all valleys before underlayment in the field, and at all hips <br /> z and ridges after underlayment in the field. <br /> square feet(100 g/m ),and are produced in rolls of various <br /> sizes. Where the slope is from 2:12(17 percent slope)up to 4:12 <br /> 4.0 DESIGN AND INSTALLATION (33 percent slope) and the roof is to be covered�with <br /> 4.1 General• asphait shinglea, or where the slope is from 2/2.12 <br /> • (21 percent slope) up to 4:12 (33 percent slope) and the <br /> Installation must comply with the applicable code, this roof is to be covered with concrete or clay roof tiles, the <br /> report and the manufacturer's published installation underlayment must be horizontally lapped 24 inches <br /> `Revised November 2012 <br /> ICC-ES EvaJuation Reports ore not to 6e consrrued as representing authettcs o�mry oiher atlrr6vtes not spectfirnity addressed��are tirey to 6e constroed � <br /> as an endorsement vjthe su6Ject oJthe repori or a recammendatron for fcs use.There is ra warmnry bylCC Evahration Servrce,LLC,exprrss or implied a+' ��,�/ <br /> tu a�ry jrnling or orher matrer in thrs report,or as to arry product covered by the report. �°1�` �"'�' <br /> Copyrlght�2ot 2 Page 1 of 2 <br />