Laserfiche WebLink
System ,;,�plications: <br /> s <br /> *Re-nail entire deck with 8D ring shank nails according to code <br /> *Replace up to 5 sheets of plywood at no additional cost <br /> *Instali high temperature Titanium PSU peel�stick underlayment(self seals around all fasteners) <br /> 'Remove all existing fascia board and install all new 2x fascia board around entire perimeter of roof <br /> "Install all new Kynar 500 Drip edge system at all eave Color: <br /> *Install all new Kynar 500 panel starter system Color: <br /> *Install all new Z flashing system for installation of inetal cap and drip edge system <br /> *Install all new 26 ga.Gulf Lok Standing Seem metal system with industries best Kynar 500 paint finish <br /> "Metal system color selection: <br /> *Instali all new Kynar 500 metal ridge cap and hip flashing <br /> *Flashings to be installed using butyl tape system as required by manufacturer instructions <br /> *Instail new closures along all hip and ridge flashings <br /> *Entire roof system to be install according to manufacturer and state/local instructions <br /> "Supply necessary permit and close all inspections , <br /> *Issue a 35 year manufacturers warranty on metal system <br /> *Issue a 10 year Platinum Labor warranty from Ryman Construction <br /> 'Bad '/:" plywood replaced at an additional cost of$1.90 per sq.ft.in the roof field.All other additional <br /> labor/wood work such as valiey replacement,truss replacement, etc.will be charged at$85.00 per man <br /> hour plus cost of materiais ( )( ) <br /> WE PROPOSE TO FURNISH MATERIAL AND LABOR-COMPLETE IN ACCORDANCE WITH THE ABOVE <br /> SPECIFICATIONS, FOR THE SUM OF: $59,500.00 (includes applicable tax,delivery, and materialsllabor) <br /> AUTHORIZED SIGNATURE DATE ��'ab -� <br /> R n onstruction, Inc. <br /> PRINT NAME G r <br /> r <br /> ACCEPTANCE SIGNATURE DATE��' � <br /> PRINT NAME I\JGtr1 c��►e_ � �D�G�I('�� <br /> 2of2 <br />