My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
13-14814
Zephyrhills
>
Building Department
>
Permits
>
2013
>
13-14814
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/11/2014 12:14:02 PM
Creation date
11/11/2014 12:14:01 PM
Metadata
Fields
Template:
Building Department
Company Name
PAY DEIGH INC
Building Department - Doc Type
Permit
Permit #
13-14814
Building Department - Name
PAY DEIGH INC
Address
5854 7TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I.Al Cats Construction within the public eights of Way shall be in conformity <br /> with the Local Jurisdiction's "Minimum Standards" PJ2 <br /> and meet N ,5,C,, F,C.C„ M U,T,C n and b,0 T, standards 44 1& <br /> 2, The Contractor shall notify Call Sunshine and other utilities prior to <br /> commencement of'construction, <br /> , Use the "Directional Pore Method" for all driveway crossings, <br /> no "accupunture missle" bores permitted <br /> 4 Al open asphalt cuts shall be restored as per exhibit F of the <br /> F,n,O.T, utility accommodation guide <br /> 5.Al side walk removal and replacement shall be restored to <br /> the Local Jurisdiction's and r b,0,T, Standard Specification No,522 -n <br /> 6 Al aerial construction shall maintain a minimum of 18' clearance parallel to � <br /> and crossing all F,n.O,T�, County & Municipal lights of Way, '�• P� <br /> 7, Must maintain an minimum 3' clearance from all wtaer & sewer lines AONr <br /> 8. Department of C'ublic Works, Utilities Inspection Division shall be notified L <br /> three(3) working days prior to commencement of construction. Q' Q- ', <br /> 9, Underground utilities have been plotted from availble records and <br /> field obervations, but are not necessarily exact.Therefore utility locations <br /> will be verified 100ft in advance of trenching, plowing and boring ...I 301. <br /> so that changes can be made in event of conflict <br /> 10. pestoration shall begin within three( ) weeks after the installation 1A'\r <br /> of cable/conduit. Full grass by seed and mulch or sodding as approved <br /> 11, No open trenches to be left open overnight. Needs to be backfilled <br /> or covered. (C'ublic Safety Hazzard) 10""'g £_- <br /> 12, No excavation shall be permitted within 10' of protected trees <br /> (20' for Grand Oaks) .Al utility installation shall be placed by directional bore <br /> begining outside of protected radius <br /> 13, These drawings are for permitting purposes only, <br /> UTILITY LEGEND <br /> • <br /> ROW <br /> x PWR WOOD POLE EOP <br /> i PWR CONCRETE POLE ------------- CENTER LINE <br /> S PWR STEEL POLE POWER <br /> CIE ST LITE COMM <br /> ® JOINT USE TRANS TELEVISION <br /> ® JOINT USE - WATER <br /> e FIRE HYDRANT SEWER- <br /> a---- CULVERT - - RECLAIM <br /> ■ STORM DRAIN - - GAS <br /> I 4am.M Mho,u all _ _ APPLICATION FOR COUNTY PERMIT TO: A^ ^^ T^T PROJECT NAME:7TH ST.& 15TH AVE.POWER SUPPLY I COUNTY <br />
The URL can be used to link to this page
Your browser does not support the video tag.