Laserfiche WebLink
90.1 (Z007) Rough-In Electrical Inspection Co lies? <br /> $tandard mP Comments/Assumptions <br /> 9.4.1.1 ;Automatic controls to shut off all building ❑Complies <br /> [EL1f� lighting installed in buildings>5,000 ft2. ❑Does Not Comply <br /> ❑Not Observable <br /> ____ ___ ❑Not Applicable <br /> 9.4.1.2 Independent lighting controls installed per ❑Complies <br /> [EL2J2 approved lighting plans and all manual ❑Does Not Comply <br /> controls readily accessible and visible to ❑Not Observable <br /> Ioccupants. <br /> __ ___ ❑Not Applicable <br /> 9.4.1.4 Separate lighting control devices for specific ❑Complies <br /> [EL4]' uses installed per approved lighting plans. ❑Does Not Comply <br /> ❑Not Observable <br /> _ ___ __ __ ❑Not Applicable <br /> 9.4.2 Ballasted one and three lamp fixtures with ❑Complies <br /> [EL5]3 >30 Wllamp have two lamp tandem wired ❑Does Not Comply <br /> ballasts when>=2 fixtures in same space �Not Observable <br /> on same control_ ❑Not Applicable <br /> 9.4.3 Exit signs do not exceed 5 watts per face. ❑Complies <br /> [EL6j' ❑Does Not Comply <br /> ❑Not Observable <br /> _ ❑Not Applicable <br /> 9.6.2 Additional interior lighting power allowed for ❑Complies <br /> [EL8]' special functions per the approved lighting ❑Does Not Comply <br /> plans and is automaticaliy controlled and �Not Observable <br /> separated from general lighting. ❑Not Applicable <br /> Additional Comments/Assumptions: <br /> i 1�High Impact(Tier 1) 2 Medium Impact(Tier 2) 3 Low Impact(Tier 3) <br /> Project Title: 12386-NESTLE ZEP Report date: 09/18/13 <br /> Data filename: P:\Projects\12000112386\DISCIPLINE\MEP\SupportWnalysis\12386-Comcheck.cck Page 3 of 4 <br />