Laserfiche WebLink
813-780-0020 City of Zephyrhills Permit Application Fax-813-780-0021 <br /> Building Department <br /> Date ReCeived <br /> Phone Contact for Permittin __ <br /> Owner's Name Cc Owner Phone Number — — �� <br /> Owner's Address � i v /JC/ Owner Phone Number � <br /> Fee Simple Titleholder Name Owner Phone Number <br /> Fee Simple Titleholder Address <br /> J08 ADDRESS � /lJ � .� / � �'�� LOT# �� <br /> SUBDIVISION G' �'� _ �;- C , PARCEL ID# <br /> (OBTAINED FROM PROPERTY TAX NOTICE) <br /> VMORK PROPOSED B NEW CONSTR 8 ADD/ALT � SIGN Q � DEMOLISH <br /> INSTALL REPAIR <br /> �ROPOSED USE Q SFR Q COMM � OTHER <br /> TYPE OF CON3TRUCTION Q BLOCK Q FRAME � STEEL Q <br /> DESCRIPTION OF WORK %7 j� ' / ! 1��,7 G ` <br /> BUILDING SIZE SQ FOOTAGE� HEIGHT <br /> OBUILDING $ VALUATION OF TOTAL CONSTRUCTION <br /> QELECTRICAL $ AMP SERVICE 0 PROGRESS ENERGY Q W.R.E.C. <br /> OPLUMBING $ <br /> ECHANICAL $ / VALUATION OF MECHANiCAL INSTALLATION <br /> GAS ROOFING Q SPECIALTY �] OTHER <br /> FiNISHED FLOOR ELEVATIONS FLOOD ZONE AREA QYES NO <br /> BUILDER COMPANY <br /> SIGNATURE REGISTERED Y/ N FEE CURRE� Y/N <br /> Address License# <br /> ELECTRICIAN COMPANY <br /> SIGNATURE rtECISrEREO Y/ N PEE CURRE� Y/N <br /> Address License# <br /> PLUMBER COMPANY <br /> SIGNATURE REGISTERED Y/ N FEE CURRE� Y/N <br /> Address License# <br /> MECHANICAL ,,� �!!'�� COMPANY /1!1 (�G � ( �!�1 ('/ <br /> SIGNATURE % REGISTERED Y! N FEE CURRE� Y/N <br /> Address �/��G` License# � � <br /> OTHER COMPANY <br /> SIGNATURE REGISTERED Y/ N FEE CURRE� Y/N <br /> Address License# —� <br /> RESIDENTIAL Attach(2)Plot Plans;(2)sets of Building Plans;(1)set of Energy FoRns;R-O-W Permit for new construction, <br /> Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stormwater Plans w/Silt Fence installed, <br /> Sanitary Fadlities&1 dumpster;Site Work Permit for subdivisionsAarge proJects <br /> COMMERCIAL Attach(3)complete sets of Building Plans plus a Life Safety Page;(1)set of Energy Forms.R-O-W Permit for new construction. <br /> Minimum ten(10)working days after submittal date. Required onsite,Construction Plans,Stortnwater Plans w/Silt Fence installed, <br /> Sanitary Facilities 8�1 dumpster.Site Work Permit for all new proJects.AII commercial requirements must meet compliance <br /> SIGN PERMIT Attach(2)sets of Engineered Plans. <br /> '""PROPERTY SURVEY required for all NEW construction. <br /> Directlons: <br /> Fill out application completely. <br /> Owner&Contractor sign back of application,notarized <br /> If over E2500,a Notice of Commencement is required. (A/C upgrades over ST500) <br /> "" Agent(for the contractor)or Power of Attomey(for the ovmer)would be someone with notarized letter from owner authorizing same <br /> OVER THE COUNTER PERMI7TING (Front of Application Only) <br /> Reroofs if shingles Sewers Service Upgrades A/C Fences(PIoUSurvey/Footage) <br /> Driveways-Not over Counter if on public roadways..needs ROW <br />