Laserfiche WebLink
R �. - <br /> � ��/ �,, <br /> �( r.. � <br /> ,��` �If��?C�"1 <br /> r,� <br /> ;���,fr4�j^ . . -�u,.,� �Pr.���r��Lc'S1�n�ine�_ry-aC <br /> ' '�".:t�'t...s.�'.;.� <br /> ' i • • <br /> Office.81_1-779-750f3 Fax�b13_779-750� <br /> LIr N CI1CIf}Ii49b <br /> Estimate for Jill Cooper Feb. 6,2014 <br /> Jill Cooper <br /> 38703 9t" Ave. <br /> Zephyrhills, FI. 33542 <br /> (941)323-0639 o2rl.� C,e�� � ��l-3o�C3_�7� <br /> Air Tech Services is estimating to complete the following: <br /> ➢ Remove existing 3 Ton Goodman- air handler & copper line set <br /> y Remove 3 Ton Goodman Condenser <br /> ➢ Remove black flex, supply and return air plenum <br /> ➢ Install new Air Handler and em pan ���� <br /> ➢ Install new R/A and S/A plenums <br /> ➢ Mastic seal all duct work <br /> ➢ Run new silver R-6 duct (where needed) <br /> ➢ Run new 3/" & 3/8" copper line set <br /> ➢ Disconnect to Condenser <br /> ➢ Set new Condenser on slab Z�-�Q� <br /> ➢ Clean all existing metal duct work <br /> ➢ Up size return air grill from 12x20 to proper size for unit <br /> ➢ Includes labor, materials & permit, AHRI rating and Heat Load Cal. <br /> ➢ Warranty 10 yr. on Compressor & Parts, 2 yr. on labor <br /> ----,.-�_- <br /> Total : OPT 1 Rheem $4100. OPT 2 Goodman $4000. <br /> *We retain the rights to the equipment that will be removed to insure the proper <br /> disposal of the equipment, as required by EPA. <br /> We purpose to furnish material and labor- complete in accordance with the <br /> specifications above. <br /> Acceptance of Proposal=s� a7.�/ <br /> date ��C� � <br /> Customer Acceptance date ` p� <br /> / <br />