My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-14983
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-14983
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/12/2014 9:29:38 AM
Creation date
11/12/2014 9:29:37 AM
Metadata
Fields
Template:
Building Department
Company Name
MAJESTIC OAKS
Building Department - Doc Type
Permit
Permit #
14-14983
Building Department - Name
NHC-FL 115 LLC
Address
3831 QUAKER RIDGE ST LOT 59
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
- ' page 1 <br /> OUVER TECHNOLOGIES,INC. revision 6/07 <br /> • FLORtDA INSTALLATION INSTRUC110NS FOR THE <br /> -�DEL 1101"V"SERIES ALL STEEL FOLLNDATION SYSTEM <br /> MODEL 1101"V"{STEPS 1-15) <br /> LONGlTUDINAL ONLY•FOLLOW STEPS 1-9 <br /> FOR ADD/NG LATERAL ARM:FoNow Steps 10.15 <br /> FOR CONCRETE APPUCATlONS:FoNow Steps 16-19 <br /> ENGINEERS STAMP ENGINEERS STAMP <br /> 1. SPECIAL CIRCUMSTANCES: If the following conditions occur-STOP! Contact Oliver Technologies at 1-800-284-7437: <br /> a)Pier height exceeds 48" b) Length of home exceeds 76'c) Roof eaves exceed 16"d)Sidewall height exceed 96" <br /> e)Location is within 1500 feet of coast <br /> n�4TL�aT1(�}QF(�RQLMIQ t�`. <br /> 2. Remove weeds and debris in an approximate two foot square to expose firm soil for each ground pan (C) . <br /> 3. Place ground pan (C)directly below chassis I-beam . Press or drive pan firmly into soil until flush with or below soil. <br /> SPECIAL NOTE:The longitudinal"V"brace system serves as a pier under the home and should be loaded as any <br /> other pier. It is recommended that after leveling piers, and one-third inch (1/3")before home is lowered completely on <br /> to piers,complete steps 4 through 9 below then remove jacks. <br /> ��"t��l�'E�It QF���4H"�:�lFS� <br /> NOTE: WHEN INSTALLING THE LONGITUD/NAL SYSTEM ONLY, A MINIMUM OF 2 SY3TEMS PER FLOOR SECTION IS REQUIRED.SOIL TEST <br /> PROBE SHOULD BE USED TO DETERMINE CORRECT TYPE OF ANCHOR PER SOIL CLASSIFICATION.IF PROBE TEST READINGS ARE BETWEEN <br /> 178 d�275 A S FOOT ANCHOR MUST BE USED.IF PROBE TEST READINGS ARE BETWEEN 276&350 A 4 FOOT ANCHOR MAY BE USED.USE <br /> GROUND ANCHORS WITH DIAGONAL TIES AND STABILIZER PLATES EVERY 5'4".VER7ICAL 11ES ARE AlSO REQUIRED ON HOMES SUPPLIED <br /> WITH VERTICAL TIE CONNECTION POINTS(PER FLORIDA REC:). <br /> 4. Setect the correct square tube brace(E)length for set-up(pier)height at support location. (The 18"tube is always <br /> used as the bottom part of the longitudinal arm). Note: Either tube can be used by itself, cut and drilled to length as long as a <br /> 40 to 45 degree angle is maintained. <br /> PIER HEIGHT 1.25"ADJUSTABLE 1.50"ADJUSTABLE <br /> (Approx.45 degrees Max.) Tube Length Tube Length <br /> 7 3/4"to 25" 22" 18" <br /> 24 3/4"to 32 1/4" 32" 18" <br /> 33"to 41" 44" 18" <br /> 40"to 48" 54" 18" <br /> 5. Install (2)of the 1.50"square tubes(E {18"tube})into the"U"bracket(J), insert carriage boft and leave nut loose for final <br /> adjustment. <br /> 6. Place I-beam connector(F)loosely on the bottom flange of the I-beam. <br /> 7. Slide the selected 1.25"tube(E)into a 1.50"tube(E)and attach to I-beam connectors(F)and fasten loosely with bolt and nut. <br /> 8. Repeat steps 6 through 7 to create the"V"pattem of the square tubes loosely in place.The angle is not to exceed 45 <br /> degree and not below 40 degrees. <br /> 9.After all bolts are tightened, secure 1.25"and 1.50"tubes using four(4) 1/4"-14 x 3/4"self-tapping screws in pre-drilled holes. <br /> �NSTALLanpN OF LeTERAL TELESCOPING TRANSV�RCE ARM SYSTEM <br /> THE MODEL 1101 "V"(LONGITUDINAL 8 LATERAL PROTECTION)EUMINATES THE NEED FOR MOST STABILI2ER PLATES 8 FRAME TIES. <br /> NOTE:THE USE OF THIS SYSTEM REQUIRES VERTICAL TIE3 SPACED AT 5'4°. <br /> FOUR FOOT(4')GROUND ANCHOR MAY BE USED EXCEPT WHERE THE HOME MANUFACTURER SPECIFIES DIFFERENT. <br /> 10. Install remaining vertical tie-down straps and 4'ground anchors per home manufacturer's instructions. NoTE: Centerline <br /> anchors to be sized according to soil torque condition.Any manufacturer's specifications for sidewall anchor loads in excess of <br /> 4,000 Ibs. require a 5'anchor per Florida Code. <br /> 11. NOTE:Each system is required to have a frame tie and stabilizer attached at each lateral arm stabilizing location.This frame tie� <br /> stabilizer plate needs to be located within 18"from of center ground pan. <br /> 12. Select the correct square tube brace(H)length for set-up lateral transverse at suppo�t location.The lengths come in either 60" <br /> or 72"lengths. (With the 1.50"tube as the bottom tube, and the 1.25"tube as the inserted tube.) <br /> 13. Install the 1.50 transverse brace(H)to the ground pan connector(D)with bolt and nut. <br /> 14. Slide 1.25"transverse brace into the 1.50"brace and attach to adjacent I-beam connector( 1 )with bolt and nut. <br /> 15. Secure 1.50°transverse arm to 1.25"transverse arm usina four(41 1/4"- 14 x 3/4"self-tappina screws in pre-drilled holes. <br /> OLIVER TECHNOLOGIES, INC. Telephone:931-796-4555 <br /> 1-800-284-7437 Fax:931-796-8811 <br /> www.olivertechnologies.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.