Laserfiche WebLink
PEC # DESCRIPTION OF THE WORK LOCATION COST <br /> INTERIOR WORK <br /> 19 FLOOR COVERING/CARPET <br /> After the removal of existing flooring, install new carpeting per the <br /> manufacturer's instructions. The carpet shall be(30) ounce, stain <br /> resistant over a minimum of%2"rebond, FHA approved. The <br /> installation shall be in an approved manner. All tack strips, metal <br /> accessories, etc., are included in this specification. The carpet <br /> shall be first quality, no seconds will be accepted. Product <br /> documentation will be provided by the contractor prior to <br /> installation. Included are all closets opening in newly <br /> carpeted areas. (3) Bedrooms <br /> 22 FLOOR COVERING/CERAMIC <br /> Note: Existing ceramic tile to remain, use caution. Info Only Info Only <br /> 56 CEILING INSULATION <br /> Check existing ceiling insulation and add insulation as required to <br /> achieve an estimated R-30(Minimum 10.375 ") in pitched roof areas. <br /> Insulation card to be supplied with final pay request. Entire House <br /> 57 WALL AND CEILING FINISH-REPAIR WORK(INTERIOR) <br /> Remove the existing damaged azeas and repair to match existing <br /> surface. Interior <br /> 64 FIXTURE SET <br /> Furnish and install a new ceramic fixture set. Color to be <br /> white. (2) Bath <br /> 69 INTERIOR DOORS <br /> Fu.rnish and install panel bi-fold doors with track and Bedrooms <br /> hardware for the closets.(2) Closets <br /> Furnish and install new pre-hung hollow flat door, frame, colonial <br /> trim, door stop and lever lockset. Color to be antique brass. Ha11 Closet <br /> PAGE TOTAL: <br />�AME: CASE#12-6096 7236 Ashland Dr. DATE: 02/25/14 PAGE: #4 <br /> Rev.3/10/I 1 <br />