My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-15074
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-15074
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2015 11:19:17 AM
Creation date
3/16/2015 11:19:11 AM
Metadata
Fields
Template:
Building Department
Company Name
ZEPHYRHILLS PUBLIC LIBRARY
Building Department - Doc Type
Permit
Permit #
14-15074
Building Department - Name
ZEPHYRHILLS PUBLIC LIBRARY
Address
5347 8TH ST
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3.1 INSTALLATION: <br /> A. All hardware shatl be applied and installed in accordance with the Finish Hardware schedule. <br /> Care shall be exercised not to mar or damage adjacent work. <br /> B. Contractor to provide a secure lock-up for hardware delivered to the project but not yet installed. <br /> Control the handling and installation of hardware items that are not immediately replaceable, so <br /> that the completion of the work will not be delayed by hardware losses both before and after <br /> installation. <br /> C. No hardware is to be installed until the hardware manufactures have provided a pre-installation <br /> class. This is to insure proper installation of the specified products. <br /> 3.2 ADJUSTING AND CLEANING: <br /> A. Contractor shall adjust all hardware in strict compliance with manufacturer's instructions. Prior to <br /> turning project to owner, contractor shall clean and make any final adjustments to the finish <br /> hardware. <br /> 3.3 PROTECTION: <br /> A. Contractor shall protect hardware as it is stored on construction site in a covered and dry place. <br /> B. Contractor shall protect exposed hardware installed on doors during the construction phase. <br /> 3.4 KEY CABINET: <br /> A. Set up and index one (1) Key Cabinet that allows room for expansion for 150% of the number of <br /> keys for the project. <br /> 3.5 HARDWARE SCHEDULE: <br /> A. The following schedule is fumished for whatever assistance it may afford the contractor; do not <br /> consider it as entirely inclusive. Should any particular door or item be omitted in any scheduled <br /> hardware group, provide door or item with hardware same as required for similar purposes. <br /> Quantities listed are for each pair of doors; or for each single door. <br /> B. This hardware schedule prepared by. <br /> IR—Security Technology <br /> 3451 Technological Ave, Suite 7 <br /> Orlando FL 32817 <br /> Ph: 407-571-2000 <br /> Fax 407-571-2006 <br /> Hardware Group No. 01 <br /> Provide each SL door(s)with the following: <br /> Qty Description Catalog Number Finish Mfr <br /> � HARDWARE BY DOOR <br /> MANUFACTURER <br /> SLIDING AUTOMATIC DOOR <br /> @2014,HJ/12010.00 FINISH HARDWARE-REVISED PER ADDENDUM 1 08 71 00-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.