My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-15114
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-15114
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2015 1:08:12 PM
Creation date
3/16/2015 1:08:11 PM
Metadata
Fields
Template:
Building Department
Company Name
SILVER OAKS
Building Department - Doc Type
Permit
Permit #
14-15114
Building Department - Name
WYATT,JONATHAN & MARTHA
Address
6826 STEPHENS PATH
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�dt�G��s .i.� ,�j <br /> State of Florida License #CCC1326166 and #CBC058155 <br /> 30427 Commerce Drive, San Antonio,FL 33576 <br /> Phone (813) 782-9080/Fax (352) 668-4803 /www.neumannroofs.com <br /> Mark Wyatt <br /> 6826 Stephens Path <br /> Zephyrhills, FL 33542 PH# 813-244-8682 <br /> ESTIMATE/CONTRACT— TIMBERLINE HD LIFETIME ROOF SYSTEM <br /> with System Plus Warranty <br /> TOTAL ESTIMATE: $ 7,100.00 <br /> Neumann Roofing, LLC proposes ta fumisn iabor, m�terial, supervision, equipment, fees and other <br /> costs related to the completion of the subject prc��ert��; specifacati�ns listed below: <br /> 1. Record Notice of Commencement and obtain a.11 required Permitting and Inspections. <br /> 2. Tear Off all existing roofing dawv�ta the wond de�k and Re-Nail to current code. <br /> 3. Remove and discard existing gutters. <br /> 4. Provide and install new ASTM 30#Fe�t underlayme�t. <br /> 5. Provide and install new Drip Edge araund entire perimeter. Color White 250' x 6" <br /> 6. Strike Lines to ensure a uniform shingle instal�ation. <br /> 7. Provide and install new GAF Pro-Start Starter Strip a$drip edge system. 200' <br /> 8. Provide and install new GAF Ti e ine HD Li�etime��ingles with stain guard. <br /> Color: T'B �.e� Squares: 28 Pitch: 5/12 <br /> 9. Provide and install new GAF Co ra III shingle os,res�eige Vents. 32' <br /> 10. Provide and install new GAF SeaI-A-Ridge Ridgc Ca�e Shingles on all hips and ridges.174' <br /> 11. Provide and install new 16"Galvanized Vatley M�tal in all valleys. 37' <br /> 12. Provide and install new Lead Boots at plumbing vents. Boots will be painted to match <br /> specified roof color. 3-2" 1-3" 1-4" grv <br /> 13. Provide and install Gooseneck Vents. Vents will be painted to match specified roof color. <br /> 14. Sweep Magnets around the perimeter area of work to collect loose nails, staples, and other <br /> various scrap sheet metal components. <br /> 15. Haul Away all roof-related debris. <br /> 16. Our Liability Insurance coverage is based on completed operations. <br /> __ ------�7�1-esti�ateslca�Lr�cts-a�e-�uh}ect-t�-�i�di��DeA�r--t�g��_A�. • <br /> county/city. AA�"e��l-�-t�a�p�ep�i��-----____-- <br /> 18. Payment Schedule: Full amount at job completion. <br /> � , o <br /> .w..an. <br /> "�'"" IN�ie'rElite <br /> FL License#: CCC 1326166 GAF License#: ME20454 <br />
The URL can be used to link to this page
Your browser does not support the video tag.