My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-15122
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-15122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/17/2015 7:30:07 AM
Creation date
3/17/2015 7:30:07 AM
Metadata
Fields
Template:
Building Department
Company Name
MAJESTIC OAKS
Building Department - Doc Type
Permit
Permit #
14-15122
Building Department - Name
NHC-FL 115 LLC
Address
39532 AUGUSTA NATIONAL DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
page 1 <br /> , OLIVER TECHNOLOGIES,INC. revision 6/0� <br /> , FLORIDA FNSTALLATION INSTRUC710N3 FOR THE <br /> MODEL 1101"V"3ERIE3 A��'E��n��wn�r�nu av_aTcu <br /> MODEL 1101"V"(STEPS 1-15) <br /> LONfiITUDlNAL OIYLY•FOLLOW STEPS 1-9 <br /> FOR ADDlMfs LATERAL ARM:Follow bdrps 10.15 <br /> FOR CONCRETE APPLICATIONS:FoOow Steps 16-19 <br /> ENGINEERS 37AMP ENGINEERS StAMP <br /> 1. SPECIAL CIRCUMSTANCES: If the foliowing oondifions occur-STOP! Confact Oliver Technologies at 1-800-2847437: <br /> aj Pier height exc�eds 48" b) Length of home exceeds 76'c)Roof eaves exceed 16"d)Sidewail height exceed 96" <br /> e)Location is within 1500 feet of coast <br /> �, <br /> 2. Remove weeds and debris in an approximate two foot square to expose firm soil for each ground pan(C) . <br /> 3. Place ground pan(C)directly below chassis I-beam . Press or drive pan firmly into soil until ftush with or below soil, <br /> SPECWL NOl'E:The longitudinal"V"brace system serves as a pier under the home and should be loaded as any <br /> ather pier. It is recommended that after leveling piers,and one-third inch(1/3")before home is lowered completely on <br /> to piers,complete steps 4 through 9 below then remove jacks. <br /> NOTE: WHEN INSTALLING THE LONG C t�Af�, A MINMAI�A OF 2 SYSTEMS PER FL SEC?lON IS REQUIRED.SOIL TESt <br /> PROBE SHOUI.O BE USED TO DETERMINE CORRECT TYPE OF ANCHOR PER SOIL CLASSIFlCATION.IF PROBE TEST READINGS ARE BETYYEEN <br /> 175 d�275 A 3 FOOT ANCHOR MUST BE U8EQ.IF PROBE TE3T READINGS ARE BE7WEEN 276 8 S30 A 4 FOOT qNCHOR MAY BE USED.USE <br /> GROUNO ANCH�S WITH DIAGONAL TIES AND STABI�QER PLATE8 EVERY S'4".VERTICAL TIES ARE/�LSO REQUIRED ON HOME3 SUPPLIED <br /> WITH VERTICAL TIE CONNECTION POINT3(PER FLORIDA REQ). <br /> 4. Select the correct square tube brace(E)length for set-up(pier)height at support location. (The 18'tube is always <br /> used as the bottom part of the longitudinal arm). Note: Either tube can be used by itself, cut and drilled to length as long as a <br /> 40 to 45 degree angle is maintained. <br /> PlER HEIGFIT 1.25"ADJUSTABLE 1.50"ADJUSTABLE <br /> (Approx.45 degrees Max.) Tube Length Tube Length <br /> 7 3/4"to 25" 22" 18" <br /> 24 3/4"to 32 1!4" 32" 18" <br /> 33"to 41" q�� �8w <br /> 40"to 48" 54^ �$. <br /> 5. tnstall(2)of the 1.50"square tubes(E {18"tube})into the"U"bradcet(J), insert carriage bolt and leave nut loose for final <br /> adjustment. <br /> 6. Place I-beam connector(F)loosely on the bottom flange of the I-beam. <br /> 7. Slide the selected 1.25"tube(E)into a 1.50"tube(E)and attach to I-beam connectors(F)and fasten loosely with bott and nut. <br /> 8. Repeat steps 6 through 7 to create the"V"pattem of the square tubes loosely in place.The angle is not to exceed 45 <br /> degree and not below 40 degrees. <br /> 9.After all bolts are tightened,secure 1.25"and 1.50"tubes using four(4) 1/4'-14 x 3/4"self-tapping screws in pre-drilled holes. <br /> INSTALI_anpN OF LeTE e �LEBCOPING eN���sRQe Rl�SYSTF6� <br /> THE MODEL 1101 W(LONGITUDINAL&LATERAL PROTECTION)E�IMINATES THE NEED FOR MOST STABILIZER PLATES 8 FRAME TIES. <br /> NO'TE:THE USE OF THIS SYS7EM REQUIRES VERTICAL TIEg gpACED AT S'4". <br /> FOUR FOOT(4')GROUNO ANCHOR MAY BE USEO EXCEPT 1NHERE THE HOME MANUFACTURER SPECIFlES DIFFEREN7: <br /> 10. Install remaining vertical tie-down straps and 4'ground anchors per home manufacturer's instructions. NOTE: Centerline <br /> anchors to be sized according to soil torque condition.Any manufacturer's speciflcations for sidewalt anchor loads in excess of <br /> 4,000 Ibs. require a 5'anchor per Fbrida Code. <br /> 11. NOTE;Each system is required to have a frame tie and stabilizer attached at each lateral artn stabilizing location.This irame tie& <br /> stabilizer plate needs to be located within 18"from of center ground pan. <br /> 12. Select the cort�ect square tube brace(H)length for set-up tateral transverse at support location.The lengths come in either 60" <br /> or 72"lengths. (Wi�the 1.50"tube as the bottom tube,and the 1.25"tube as the inserted tube.) <br /> 13. Instalt the 1.50 transverse brace(H)to the ground pan connector(b)with boft and nut. <br /> 14.Slide 1.25"tran5verse brace into the 1.50'brace and attach to adjacent I-beam connector(I )with bolt and nut. <br /> 15.Secure 1 50"transverse arm to 1 25"transverse arm usina four(4) 1/4" 14 x 3J4"self tanninq screws in ore-drilled holes <br /> OLtVER TECHNOLOGIES, INC. Telephone:931-796-4555 <br /> 1-800-2847437 Fax:931-796$811 <br /> www.olivertechnologies.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.