Laserfiche WebLink
Compliance Summary ' <br /> Component Design Criteria Result <br /> Gross Energy Cost(in$) 4,870.0 . 5,668.0 PASSED <br /> LIGHTING CONTROLS PASSES <br /> EXTERNAL LIGHTING PASSES <br /> HVAC SYSTEM PASSES <br /> PLANT None Entered <br /> WATER HEATING SYSTEMS (SNSTA- HmT� None Entered <br /> PIPING SYSTEMS None Entered <br /> Met all required compliance from Check List? Yes o/NA <br /> IMPORTANT MESSAGE <br /> Info 5009 -- -- --An input report of this design building must be submitted along with this <br /> Compliance Report <br /> EnergyGauge Summit0 FlalCom-2010.Section 506.4 Compliant Software.Effective Date:March 15,2012 <br /> 4/25/2014 Page 2 of 9 <br />