BIANCO CONSTRUC'I'ION <br /> ' ' ' PROPOSAL/CONTRACT <br /> May 21,2014 <br /> Between Brian&Sarah Connelly <br /> 5522 18'h St. <br /> Zephyrhills,FI 33542 <br /> 813-454-4993 <br /> And the Contractor: BIANCO CONSTRUCTYON <br /> Biancoconstrucrionco.com <br /> CBC060201&CCC1329319 <br /> 15147 MYRTLE ST <br />' DADE CITY,FL 33523 <br /> 352-567-9029 <br /> For the Project: PROJECT: Rooting at 5522 <br /> ` Contractor ro oses to furnish all la6or as listed below for the above mentioned Pro'ect. <br /> DESCRIBE WORK,MATERIALS OR LABOR AMOUNT <br /> Tear-Off Existing Roof <br /> Inspect Decking Making Any And All Repairs <br /> Up To 10 Sheets Of Plywood Included In Project <br /> Any Additional Sheets Shall Be Installed At <br /> $45 Per Sheet Labor And Materials <br /> Roof Deck Re-Nailed To Code <br /> Insta11301b felt Underlayment <br /> Insta113 tab Shingle Roof System <br /> (25 year manufacturers'warranty) <br /> Bianco Construction Installation Warranty 2 yrs <br /> Install Aluminum Ridge Vent <br /> Replace All Roof Related Metals , <br /> Flat roof portion will consist of <br /> Rolled Peel N Stick Underlayment <br /> Peel N Stick Rolled Roofing <br /> Dispose of all Debris <br /> Labor And Materials $11,560.00 <br /> Repair Soffit And Fascia(If Needed) <br /> $45 Per Man Hour <br /> And Cost Plus 20%On Materials <br /> This Proposal Includes Permitting <br /> This proposal shall 6e valid for 20 days. <br /> This price dces not reflect any hidden structural defects,termite damage,wood rot,or other <br /> defective components of the existing house(*unless specified) which may need to be repaired or <br /> replaced in order to proper(y complete the above-quoted work,and further acknowledge that the <br /> expense,if any,will be the responsibility of the property owner. <br /> A Chanae Order is any change to the original plans and/or specifications. All change orders <br /> need to be agreed upon in writing,including cost,additional time considerations,approximate <br /> dates when the work will begin and be completed,a legal description of the location where the <br /> work will be done and signed by both parties. NO extra work will be started or special order <br /> items ordered until the extra work/change order sheet has been signed by all parties,contractor, <br /> owner and subcontractor (If applicable)and payment in full for the addirional work to be done or <br /> special order item(s)ordered. <br /> PAYMENT SCHEDULE <br /> Due Before Commencement Of Project..................$5780.00 <br /> Remaining Balance at Completion Of Project...........$5780.00 <br /> Peter Bianco Construction,Inc,The Contractor shall promptly pay all sums owed to <br /> laborers,subcontractors,and material-men who supply labor and/or materials for the work <br /> and shall indemnify,hold harmless,and defend the owner and the property on which the <br /> work is located from mechanic's and materiai-men's liens. The contractor will furnish a <br /> final lien w t en da3�s.after final payment received. <br /> RESPEC TTED <br /> Signature dba,Peter Bianco Construction,Inc. <br /> Date: <br /> ACCEPTANCE OF PROPOSA AND C <br /> THE ABOVE PRICES,SPECIFICATIONS,TERMS,AND CONDITIONS ARE <br /> SATIFACTORY AND ARE HEREBY ACCEPTED. PETER BIANCO CONSTRUCTION, <br /> INC.IS HEREBY AUTRHORIZED TO PERFORM TF�WORK AS SPECIFIED. PAYMENT <br /> SHALL BE MADE AS OUTLINED ABOVE. UWE FURTHER ACKNOWLEDGE THAT WE <br /> HAVE RECENED AND REVIEWED THE FOLLOWING NOTICES: <br /> YER'S RIGHT�CE E TO HE OWNE IENS <br /> Ac ted t�y_: "' ) )/ l <br /> � � � ��/ /� <br /> Owner Signature Date ner Signa ure Date � <br />