NOTICE OF DEED RESTRICTIONS� The undersigned understands that this permit may be subject to"deed" restrictions"
<br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any
<br /> applicable deed restrictions.
<br /> UNLICENSED CONTRACTORS AND CONTRACTOR RESPONSIBILITIES. If the owner has hired a contractor or
<br /> contractors to undertake work, they may be required to be licensed in accordance with state and local regulations. If the
<br /> contractor is not licensed as required by law, both the owner and contractor may be cited for a misdemeanor violation
<br /> under state law If the owner or intended contractor are uncertain as to what licensing requirements may apply for the
<br /> intended-work, they are advised to contact the Pasco County Building Inspection Division—Licensing Section at 727-847-
<br /> 8009. Furthermore, if the owner has hired a contractor or contractors, he is advised to have the contractor(s) sign
<br /> portions of the "contractor Block" of this application for which they will be responsible. If you, as the owner sign as the
<br /> contractor, th�at may b� an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco
<br /> County.
<br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RESOURCE RECOVERY FEES. The undersigned understands
<br /> _ that Transporta�ion._Imp�Gt Fees and Recourse Recovery Fees may apply to the construction of new buildings, change of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and
<br /> 90-07, as amended. The undersigned also understands, that such fees, as may be due, will be identified at the time of
<br /> permitting. It is further understood that Transportation Impact Fees and Resource Recovery Fees must be paid prior to
<br /> receiving a "cartificate of occupancy" or final power release. If the project does not involve a certificate of occupancy or
<br /> final power rele�se, the fees must be paid prior to permit issuance Furthermore, if Pasco County Water/Sewer Impact
<br /> fees are due, they must be paid prior to permit issuance in accordance with applicable Pasco County ordinances.
<br /> CONSTRUCTION LIEN LAW(Chapter 713, Florida Statutes, as amended): If valuation of work is $2,500.00 or more, I
<br /> certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applicant is someone
<br /> other than the "owner", I certify that I have obtained a copy of the above described document and promise in good faith to
<br /> deliver it to the"owner" prior to commencement.
<br /> CONTRACTOR'S/OWNER'S AFFIDAVIT: I certify that all the information in this application is accurate and that all work
<br /> will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br /> hereby made to obtain a permit to do work and installation as indicated. I certify that no work or installation has
<br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. I also
<br /> certify that I understand that the regulations of other government agencies may apply to the intended work, and that it is
<br /> my responsibility to identify what actions I must take to be in compliance. Such agencies include but are not limited to:
<br /> I - Department of Environmental Protection-Cypress Bayheads, Wetland Areas and Environmentally Sensitive
<br /> Lands, Water/Wastewater Treatment.
<br /> - Southwest Florida Water Management District-Wells, Cypress Bayheads, Wetland Areas, Altering
<br /> Watercourses. '
<br /> - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways
<br /> - Department of Health & Rehabilitative Services/Environmental Health Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> - US Environmental Protection Agency-Asbestos abatement.
<br /> - Federal Aviation Authority-Runways.
<br /> I understand that the following restrictions apply to the use of fill:
<br /> - Use of fill is not allowed in Flood Zone"V" unless expressly permitted.
<br /> - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a
<br /> "compensating volume" will be submitted at time of permitting which is prepared by a professional engineer
<br /> licensed by the State of Florida.
<br /> - If the fill material is to be used in Flood Zone "A" in connection with a permitted building using stem wall
<br /> construction, I certify that fill will be used only to fill the area within the stem wall.
<br /> - If fill material is to be used in any area, I certify that use of such fill will not adversely affect adjacent
<br /> properties. If use of fill is found to adversely affect adjacent properties, the owner may be cited for violating
<br /> the conditions of the building permit issued under the attached permit application, for lots less than one (1)
<br /> acre which are elevated by fill, an engineered drainage plan is required
<br /> If I am the AGENT FOR THE OWNER, I promise in good faith to inform the owner of the permitting conditions set forth in
<br /> this affidavit prior to commencing construction I understand that a separate permit may be required for electrical work,
<br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application A
<br /> permit issued shall be construed to be a license to proceed with the work and not as authority to violate, cancel, alter, or
<br /> set aside any provisions of the technical codes, nor shall issuance of a permit prevent the Building Official from thereafter
<br /> requiring a correction of errors in plans, construction or violations of any codes. Every permit issued shall become invalid
<br /> unless the work authorized by such permit is commenced within six months of permit issuance, or if work authorized by
<br /> the permit is suspended or abandoned for a period of six (6) months after the time the work is commenced An extension
<br /> may be requested, in writing, from the Building Official for a period not to exceed ninety (90) days and will demonstrate
<br /> justifiable cause for the extension. If work ceases for ninety(90) consecutive days, the job is considered abandoned.
<br /> WARNING TO OWNER: YOUR FAILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR
<br /> PAYING TWICE FOR IMPROVEMENTS TO YOUR PROPERTY. IF YOU I TEND TO OBTAIN FINANCING, CONSULT
<br /> WITH YOUR LENDER OR AN ATTORNEY BEFORE RECORDING YOUR OTICE OF CO EMENT.
<br /> FLORIDA JURAT(F S.117.03) �/�
<br /> OWNERORAGENT �V�� ��G�� CONTRACTOR
<br /> scri ed and sworn,�(qr ffirmed)befor� e this Subscribed and s orn to or affirme fere me this
<br /> by l�V�rn�,G��! A ril 30 2 nv W.Ankersmit
<br /> Who is are personally known to me or-has/�iave produced Who is/ar ersonall known 2o me or has/have produced
<br /> as identification. � as identification.
<br /> I Notary Public / Notary Public
<br /> Commission No. O�U D 7 1 3 ��/ �.��°'�'°P'°'�op� Commission No. / � i (�' ( ,
<br /> —C�'�/'�i E, (�,t,� ��� ���aa,T.A.o.�,ti� � � . n z_
<br /> Name of Notary typed,printed or stamped � � °°��J�°,�� _ame of Notary t d,printed or stampe
<br /> ° �a-���
<br /> �� �� ;•S�Y'°yb-., WENDYGOMEZ
<br /> s � ,Tq �;
<br /> :a. F, .= MY COhiMISSION#EE 138467
<br /> � ;:'•r ' �os EXPIFES:October 17,2015
<br /> < �: "tF aF N°?'' Bonded Thru Notary Public UnderWriters
<br /> m ��a
<br /> �a9 ,� �U����J
<br /> ��yl�7'°A`�.meoaooew>`O�a�
<br /> %�� CC���,�
<br /> �D�esaevo�vaaw��w,
<br />
|