Laserfiche WebLink
Sunrise Properties <br /> Proposed Impact Fees(new addition) <br /> Based on 4977 total sq.ft.addition (Retail) 3318 sq.ft. Conditioned <br /> Water/Sewer Impact fee=$813.79 <br /> Public Safety Fee=$1,900.00 <br /> Transportation Impact Fee=$9,885.36 <br /> (Transportation Impact fee was based on 1,862 square feet,taking in consideration that portion that is <br /> exempt based on an accessory use to main use and square footage removed for back exit.). <br /> Proposed Impact Fees(if existing specialty retail building is removed) <br /> Existing building square feet=4852 <br /> Water/Sewer Impact Fee=$0 �f <br /> Public Safety Impact Fee=$45.00 '4` <br /> Transportation Impact Fee=$0 i� <br /> - Water Meters will be $309.70 per%inch meter required. <br /> Existing building would be required to be removed prior to build-out of any,unit in phase II to receive <br /> impact fee credits. (Public safety impact fee credit is only applicable if building is removed prior to Phase <br /> I construction). <br /> Yotal impact fees due during phase I construction would be$2,356.69 ��� :-b L�=�M-���-��, <br /> These fees are a close estimate and could be more or less at time of final plan approval/permitting. <br />