Laserfiche WebLink
�r � �il�ar Ronf in Inc. <br /> � 15911 11.5. 3�1, Dade City, FL 33523 5tate Cert Roufer#CCC13Z9092 � <br /> Ph: 80�/5E2-2393 Fax: 352/5E7-4454 RCI Re Roof.Consultant #�149 ' d � <br /> 9 <br /> milbarCearthlink.net � - <br /> ROOF PROPOSAL,paqe 1 of 2 <br /> DATE: 05/20/14 <br /> TO. UNDERWOOD, MARY R PH� 813/788-7809 <br /> F341 TANGERINE DRIVE <br /> ZEPHYRHILLS, FL 33542 <br /> JOB SINGLE FAMILY RESIDENCE <br /> ZEPHYR HEIGHTS <br /> 5341 l`ANGERI�E DRIVE <br /> ZEPHYRHILLS, FL 33542 <br /> --------------------------------------------------------------------------------------------- <br /> --------------------------------------------------------------------------------------------- <br /> SHINGLE RE-ROOF <br /> 1 Tear off and haul away existing one-layer shingle roofing system. <br /> .� <br /> 2. Re-fasten the existing plywood roof deck in accordance with the Florida Building Codes <br /> 3. Provide and install the new 15 Ib. saturated felt paper(ASTM D-226) secondary water barrier in accordance with <br /> the Florida Building Codes. � <br /> 4 Provide and install new algae-resistant fiberglass shingles, Owner to choose shingle color from manufacturer's <br /> standard colors Provide manufacturer's limited shingle warranty Please see options on page 2. <br /> 5 Replace all valley flashing and re-flash roof penetrations. <br /> 6 Provide and install new lead boots for the plumbing vents. � � � <br /> 7. Provide and install new pre-finished aluminum eavedri (white o brown) <br /> 8. Repair/Replacement of any rotten or damaged wood (deck, fascia, trim, framing, etc.) will be completed on a cost- <br /> plus basis above and beyond the contract price ($55.50 per 4'x8'x1/2"sheet of CDX plywood replaced, labor&materials,$27 75 <br /> per 1/2 sheet) Contract sum does not include any painting. <br />, 9. MilBar Roofing, Inc. to provide a 5-year workmanship warranty to the original purchaser that covers shingle roof <br /> leaks; exclusions: storm damage, work done or damage by others, tree damage, and/or structural damage to roof <br /> deck. <br /> 10 � Owner to� provide access to roof for delivery truck for loading/unloading of roofing materials; access to electricity <br /> 11. MilBar Roofing, Inc. to provide General Liability and Worker's Compensation Insurance ($2,000,000 limit) and re- <br /> roofing permit. <br /> ______ �n,�t _ �_ re.ww�. _5��e�1�..�_�1r` �.�_�.�.����____���_____________________ <br /> We propose to furnish material and labor,complete in accordance with above specifications,for the Contract Sum of: <br /> ' As stated in Options on Page 2. <br /> --------------------------------------------------------------------------------------------- <br /> --------------------------------------------------------------------------------------------- <br /> Payment to be made as follows: Due Upon Completion. <br />