My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-15411
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-15411
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/17/2015 9:22:25 AM
Creation date
8/17/2015 9:22:24 AM
Metadata
Fields
Template:
Building Department
Company Name
VALLEYDALE RO ASSOCIATION
Building Department - Doc Type
Permit
Permit #
14-15411
Building Department - Name
ROY,PAUL
Address
6803 SUNNIDALE DR
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
' installation Instructions for Elixir 7Q0 Series Windows <br /> 1. Check that the rough opening is square and 1/2" larger than the window in <br /> width and height. <br /> 2. Apply a continuous 1/4" bead of silicone around the perimeter of the opening <br /> on the exterior sheathing where the windaw na's1 fin will cantact the wail. <br /> 3. Place temporary shims in both bottom corners and the cer�ter of the opening. <br /> 4. Insert the window into the opening and set the unit on the temporary shims. <br /> 5. Place temporary shims on all sides of the window until the unit is square. <br /> � 6, Place one nail or fastener in each corner of the nai! fin and eheck wir�dow <br /> operation. Adjust shims if necessary. <br /> 7. When �he window operates correctly and all interior site lines look correct, <br /> place a fastener in at least every other hole in the r�ail fin. Fasteners should have <br /> large heads, like raafing nails, for better performance. <br /> 8. Remove all shims and recheck window site lines and operation. Replace shims <br /> and adjust€asteners if necessary, Do not leave shims in the rough opening, <br /> 9. Due to vinyl's�expansion and contraction praperties, the window frame <br /> should not tauch the rough opening frame when properfy instal{ed. Vinyl <br /> windows shauld "flaat" in the openir►g to promote better operatior� after <br /> structure settling ar leveling. <br /> 1C1. Caver the nail fin and exteriar sheathing with a construction grade flashing <br /> tape. <br />
The URL can be used to link to this page
Your browser does not support the video tag.