Laserfiche WebLink
SPEC# DESCRIPTION OF THE WORK LOCATION COST <br /> INTERIOR WORK <br /> 1 DEMOLITION/REMOVALS <br /> Remove and dispose of two walls constructed in garage taking <br /> garage back to its original configuration. Terminate any wiring in <br /> the walls to code. Interior <br /> Scrape popcorn ofF ceilings and prepare for texture. (See Interior <br /> Spec. #58) Info Only Info Onlv <br /> Remove and dispose of wallpaper in kitchen and master bathroom <br /> and prepare for new texture on walls. (See Interior Spec. #58) As Noted Info Oniv <br /> 19 FLOOR COVERING/CARPET <br /> After the removal of existing flooring, install new carpeting to <br /> manufacturer's instructions. The carpet shall be (30)ounce, stain <br /> resistant over a minimum of'/2"re-bond, FHA approved. The <br /> installation shall be in an approved manner. All tack strips,metal <br /> accessories, etc. are included in this specification. The carpet <br /> shall be first quality.No seconds will be accepted. Product <br /> documentation will be provided by the contractor prior to <br /> installation. Included are all closets opening into newly carpeted Living Room, <br /> areas. Bedrooms&Hallway <br /> 22 FLOOR COVERING/CERAMIC <br /> Professionally steam clean the existing tile and grout. All Tiled Areas <br /> Note: Ezisting ceramic tile to remain,use caution. All Tiled Areas Info Only <br /> 25 BASE & SHOE MOLDING <br /> Remove shoe mold throughout house,preparing existing base <br /> throughout the house for paint. (See Interior Spec. #87) Interior <br /> 36 WINDOW REPAIR <br /> Repair the existing windows to proper operating condition. This <br /> includes closers, springs, weather stripping,and sashes. Include <br /> cleaning window tracks and lubricating. This is an allowance <br /> item. Interior $100.00 <br /> PAGE TOTAL• <br /> CASE#: 13-6024 4739 Timber Way DATE: 06/Ol/14 PAGE: #5 <br /> Rev.3/10/11 <br />