Laserfiche WebLink
SPEC# DESCRIPTION OF THE WORK LOCATION COST <br /> 80/81 PLUMBING-GENERAL SPECIFICATIONS <br /> PLiTMBING FIXTURES (Continued) <br /> Install a new elongated toilet complete with new supply line and <br /> angle stop with new escutcheon. Color to be bone. Master&Hall Bath <br /> Furnish and install two new oval self-rimming vitreous china <br /> lavatories complete with faucet,traps, supplies and angle stops. <br /> Color to be bone. Master Bath <br /> Furnish and install a new oval self-rimming vitreous china sink <br /> complete with faucet,traps, supplies and angle stops. Hall Bath <br /> � <br /> { <br /> ��� Provide all plumbing connections for new dishwasher. Include a <br /> ��,� water line complete with Hanson type shut-off valve for icemaker. <br /> /� (See Interior Spec. #82) Kitchen Info Only <br /> �Install a new 40 allon u ri t electric water heater to code. Protect <br /> g P � <br /> water heater from vehicular damage. (If it is required by code.) Garage <br /> 82 MAJOR APPLIANCES <br /> Furnish and install a new 30" electric range. The cost of the <br /> Range is to be $450.00 Kitchen <br /> Furnish and install a new ductless over-the range microwave. <br /> The cost of the new microwave is to be$275.00. (See Interior <br /> Spec. #78) Kitchen <br /> Furnish and install a new 21 cubic foot refrigerator with ice <br /> maker. The cost of the refrigerator to be $750.00 Kitchen <br /> Fu.rnish and install a new dish washer. The cost of the dish <br /> washer is to be$250.00. Kitchen <br /> All the appliances are to be of the same brand. Info Only Info Onlv <br /> PAGE TOTAL• <br /> CUM TOTAL: <br /> CASE #: 13-6024 4739 Timber Way DATE: 06/Ol/14 PAGE: #9 <br /> Rev.3/10/11 <br />