Laserfiche WebLink
� NOTICE OF DEED RESTRICTIONS: The undersigned und rstands that this permit may be subject to"deed"restrictions" <br /> which may be more restrictive than County regulations. The undersigned assumes responsibility for compliance with any <br /> applicable deed restrictions. <br /> UNLICENSED CONTRACTORS AND CONTRACTOR RE PONSIBILITIES: If the owner has hired a contractor or <br /> contractors to undertake work,they may be required to be li ensed in accordance with state and local regulations. If the <br /> contractor is not licensed as required by law, both the own r and contractor may be cited for a misdemeanor violation <br /> under state law. If the owner or intended contractor are u certain as to what licensing requirements may apply for the <br /> intended work,they are advised to contact the Pasco Count Building Inspection Division—Licensing Section at 727-847- <br /> 8009. Furthermore, if the owner has hired a contractor contractors, he is advised to have the contractor(s) sign <br /> portions of the"contractor Block"of this application for whic they will be responsible. If you, as the owner sign as the <br /> contractor,that may be an indication that he is not properly licensed and is not entitled to permitting privileges in Pasco <br /> County <br /> TRANSPORTATION IMPACT/UTILITIES IMPACT AND RE OURCE RECOVERY FEES: The undersigned understands <br /> that Transportation Impact Fees and Recourse Recovery Fe s may apply to the construction of new buildings,change of <br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco County Ordinance number 89-07 and <br /> 90-07, as amended. The undersigned also understands,th t such fees,as may be due,will be identified at the time of <br /> permitting. It is further understood that Transportation Impa t Fees and Resource Recovery Fees must be paid prior to <br /> receiving a"certificate of occupancy"or final power release. If the project does not involve a certificate of occupancy or <br /> I final power release,the fees must be paid prior to permit is uance. Furthermore, if Pasco County Water/Sewer Impact <br /> I fees are due,they must be paid prior to permit issuance in a ordance with applicable Pasco County ordinances. <br />, CONSTRUCTION LIEN LAW(Chapter 713,Florida Statut s,as amended): If valuation of work is$2,500.00 or more,I <br /> certify that I, the applicant, have been provided with a py of the "Florida ConsVuction Lien Law—Homeowner's <br /> Protection Guide"prepared by the Florida Department of Ag iculture and Consumer Affairs. If the applicant is someone <br /> other than the"owne�',I certify that I have obtained a copy o the above described document and promise in good faith to <br /> deliver it to the"owner"prior to commencement. <br /> CONTRACTOR'SIOWNER'S AFFIDAVIT I certify that all t e information in this application is accurate and that all work <br /> will be done in compliance with all applicable laws regulatin construction,zoning and land development. Application is <br /> hereby made to obtain a permit to do work and installati n as indicated. I certify that no work or instailation has <br /> commenced prior to issuance of a permit and that all work will be performed to meet standards of all laws regulating <br /> construction, County and City codes, zoning regulations, a d land development regulations in the jurisdiction. I also <br /> certify that I understand that the regulations of other govern ent agencies may apply to the intended work,and that it is <br /> my responsibiiity to identify what actions I must take to be in ompliance. Such agencies include but are not limited to: <br /> - Department of Environmental Protection-Cypres Bayheads, Wetland Areas and Environmentally Sensitive <br /> Lands,Water/Wastewater Treatment. <br /> - Southwest Florida Water Management Dist ct-Wells, Cypress Bayheads, Wetland Areas, Altering <br /> Watercourses. <br /> - Army Corps of Engineers-Seawalls,Docks,Navi able Waterways. <br /> - Department of Health & Rehabilitative Service /Environmental Health Unit-Wells, Wastewater Treatment, <br /> Septic Tanks. <br /> - US Environmental Protection Agency-Asbestos a atement. <br /> - Federal Aviation Authority-Runways. <br /> I understand that the following restrictions apply to the use of ill: <br /> - Use of fill is not allowed in Flood Zone"V"unless xpressly permitted. <br /> - If the fill material is to be used in Flood Zon "A", it is understood that a drainage plan addressing a <br /> "compensating volume°will be submitted at tim of permitting which is prepared by a professional engineer <br /> licensed by the State of Florida. <br /> - If the fill material is to be used in Flood Zone ' " in connection with a permitted building using stem wall <br /> construction,I certify that fill will be used only to fi I the area within the stem wall. <br /> - If fill material is to be used in any area, I ce ify that use of such fill will not adversely affect adjacent <br /> properties. If use of fill is found to adversely aff ct adjacent properties,the owner may be cited for violating <br /> the conditions of the building permit issued und r the attached permit application, for lots less than one(1) <br /> acre which are elevated by fill,an engineered dra nage plan is required. <br /> If I am the AGENT FOR THE OWNER,I promise in good fait to inform the owner of the permitting conditions set forth in <br /> this affidavit prior to commencing construction. I understand that a separate permit may be required for electrical work, <br /> plumbing, signs, wells, pools, air conditioning, gas, or other installations not specifically included in the application. A <br /> permit issued shall be construed to be a license to proceed ith the work and not as authority to violate, cancel,alter,or <br /> set aside any provisions of the technical codes,nor shall issu nce of a permit prevent the Building Official from thereafter <br /> requiring a correction of errors in plans,construction or violati ns of any codes. Every permit issued shall become invalid <br /> unless the work authorized by such permit is commenced wi hin six months of permit issuance, or if work authorized by <br /> the permit is suspended or abandoned for a period of six(6) onths after the time the work is commenced. An extension <br /> may be requested, in writing,from the Building Official for a eriod not to exceed ninety(90)days and will demonstrate <br /> justifiable cause for the extension. If work ceases for ninety( 0)consecutive days,the job is considered abandoned. <br /> n <br /> WARNING TO OWNER: YOUR AILURE TO RECORD A NOTICE OF COMMENCEMENT MAY RESULT IN YOUR <br /> PAYING TWICE F IMPROV ENTS TO YOUR PROPE TY. IF INTEND TO BTAIN FINANCING,CONSULT <br /> WITH YOUR LENDER R AN ORNEY BEFORE RECO DING OU OTICE Q COMMENCEMENT. <br /> FLORIDA JURAT(F.S.117.0 <br /> OWN�GENT CON RACTOR <br /> S d swom to(o � b fore me this Sub ' sworn (or fir d)bQfQre e this <br /> by by J Y <br />' o i are personally known m a ave produced o i/are p rsonaliy known to m � haslhave roduced <br />� i ntlfication. identificaGon. <br /> / � <br /> Public �u Notary Public <br /> ���,,,,,,, � � '. SUZANNE ALLEN <br /> mission No. Com ission No. �:'' <br /> `�^4Ppv v � <br /> � • •`�' Notary Publi f Sta _ _ tate of Florida <br /> �, • * - :�:M 'iomm.Ex ires Oct 25,2015 <br /> '�� Name of Notary typed,prin e or a p�.` <br /> N °a�o �C mmission#E°�5��� ,, oFC�o.• Commission#EE 131770 <br /> :�.�� `o:` �.,�����.•. <br /> %,.°����` <br />