My WebLink
|
Help
|
About
|
Sign Out
Browse
Search
14-15546
Zephyrhills
>
Building Department
>
Permits
>
2014
>
14-15546
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/19/2015 7:56:51 AM
Creation date
8/19/2015 7:56:51 AM
Metadata
Fields
Template:
Building Department
Company Name
CHAMBER OF COMMERCE
Building Department - Doc Type
Permit
Permit #
14-15546
Building Department - Name
CHAMBER OF COMMERCE
Address
38550 5TH AVE
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. ' <br /> , - � <br /> ` J ; <br /> � <br /> • Inctudes clasing in of the north east door in th front of bullding and a window installed in that � <br /> area,w3th stucca to match around tlosed in a ea.Interior of bu(lding will be finished to match . <br /> existing, � <br /> Roofing � <br /> • NONE <br /> Finishes � <br /> • Ciean existing entry walkway and acid wash a needed to apply a new logo.l.ogo wlll be acryllc , <br /> coating with owner's choice of pattern.All m erials and labor furnished. <br /> • Exterior of entire building to be painted with ne coat of exterior acrylic primer and twa coats of ; <br /> exterlor flat acrylic palnt,owner's choice of t o colors-on�for the body and one for the trtm , I <br /> colors.Includes af1 materiaf5 and labar furnlsh d. ' ' <br /> i <br /> . ; <br /> Plumbing <br /> • Nane <br /> . <br /> Electrical <br /> • None <br /> Not Pncluded In bid <br /> • Surveys <br /> � Impact fees <br /> • tandscaping and sod <br /> • Waterconsumption <br /> Contract Change orders <br /> • 4wner may at any reasonable time during th progress of the work,by and order in writing, <br /> agreed to and signed by both parties,make a y alteration to the p[ans and specffication,and the <br /> work shall then be executed accord)ng to cn armance with an executed change order and paid <br /> for in advance.IP the change 1s a deletion the amount shal)be credited against the finai <br /> payment.There will be a$�0 administratlan ee for each change order <br /> � Commencement Date and Protectfon <br /> • The contract amount has 8een determined a of the contract date, Because of the pertodsof <br /> inflation in the building industry,builder wlll nly guarantee that amount fnr�5 days from <br /> Contract date,lf any problems arlses which elays commencement through no fautt of builder, <br /> there may be�an additlanal amount added t contract.This ffgure will be determined at the time <br /> that construction commences.At that time, bui{der requests a price increase n writing,owner <br /> has their option of canceling the contract by tetter in writing to the builder within ten(10} <br /> caiendardays from the date increases reque ted. <br /> According to Florida's Construction Lien Law(Sectla 713,Od1-713.37-,Florida Statues),those who work <br /> or provide meterials artd services and are not paid in full have a right to enforce thelr clatm for payment <br />
The URL can be used to link to this page
Your browser does not support the video tag.