Laserfiche WebLink
i . ` <br /> SPEC# DESCRIPTION OF'THE W4RK L4CATTON CUST <br /> 63 INTERI4R W'AI.L FIlYISH-CERA.MIC TIL HIN SET Continued <br /> Install a new ceramic tiie backsplash. Assume# e"cast of the <br /> � tile"at$2.00 per sq.ft. af area. Colar/design to e selected by#1ie <br /> i Housing Specialist. Kitehen 350.4Q <br /> 64 FIX'TURE SET <br /> Furnish and instalt a new ceramic fi�ture set, Cv or ta be <br /> selected by the Housing Speczalist. Bath 25.00 <br /> 69 INTERIUlt DOORS <br /> � Furnish and instail new lever lock sets. Color i to be brushed <br /> ; nickel. A11 Iuterior poors 285.04 <br /> ' 73 CABINET-VANTTY <br /> � Remove existing vanity top and install a new c tured marble top <br /> ' on existing vanity. (See Interior Spec.#80I$I). Hall Bath 350.00 <br /> � NOTE: Existing vanity to remain. Insure t at during the <br /> � bathroom remodel it is gently removed and tared for future <br /> I installation. Hall Bath Info Onlv <br /> � <br /> 74 CAB�IYET MEDICINE <br /> Supply and install new recessed mow�ted minr red medicine <br /> cabinet at left of vanity. Hall Bath 75.00 <br /> Remove large mirrored medicine cabanet and'�sta11 a new wall <br /> � mau.nted mirrar sized properly ta the e�sting anity. Hall Bath 100.Q0 <br /> 75 CABINETS-KTTCHEN/COUNTER TOP <br /> J.Y4TE. E�isting cabinets and cauntertops o remain. Insure <br /> i <br /> they are pratected from any damage durin the rehab process. Kitchen Info Onlv <br /> � <br /> 78 ELECTRICAL .��^ <br /> Install new hardwired smakelcarbon detectors to cade. Entire House 675.00(�-� <br /> Install a new GFCI outlet to code. Hall Bath 124.04 i��t�� <br /> PAGE Td�'AL: 1980.00 <br /> , r� <br /> �� f?� CI;`M TOTAL: 11,565.0�1 <br /> CASE#: ].4-6QQ1 4617 Wisteria Drive DAT : 05/30/14 FAGE: #7 <br /> Rev.3/10/11 <br />