-�
<br /> .
<br /> fNOTICE OF DEED R��TRICTIONS: The undersigned understands that this permit may be subject to"deed"restrictions"
<br /> which may be more restrictive than County segulations. The undersigned assumes responsibility for compEiance with any �
<br /> ' applicable deed restrictions.
<br /> UNl.ICENSED CONTRACTORS �►ND CONTEZACTt�R RESPONSIBf�MT1ES: If the owner has hired a cantrac#or or
<br /> contractors #o undertake work, they may be required to be licensed in accordance with sfate and local regulations. if fhe
<br /> contractor is not licensed as required by law, both the owner and con#ractor may be cited for a misdemeanor violation
<br /> under state iaw. ff the awner or intended contractar are uncertain as to v�rhat I�censing �equiremenfs may apply far the
<br /> intended work, they are advised to contac#the Pasco County Building Inspectian Division--Licensing Section at 727-847-
<br /> 80Q9. Furthermore, if the owner has hired a contractar or conttacta�-s, he 9s advised to have the contractor(s) sign
<br /> portions of the "contractor Block" of this applica#ion far which they wi1P be responsible. tf you, as the awner sign as the
<br /> contractar, that may be an indication tha# he is not praperly licensed and is not entitled to permitting privileges in Pasco
<br /> Count}r.
<br /> TRAN�PORTATION IMPACI'/UTILITIES IIIAP�►.CY AND R�50URCE FtECOVERY F�ES; The undersigned understands
<br /> that Transpartation Impact Fees and Recourse Recovery Fees may app{y to the constructian of new buildings, change of
<br /> use in existing buildings, or expansion of existing buildings, as specified in Pasco Caunty Ordinance number 89-Q7 and
<br /> 90-07, as amended. The undersigned aiso understands, that such fees, as may be due, wilt be identified at the time of
<br /> permitting. it is further understood fhat Transpartation Impact Fees and Resource Recovery Fees must be paid priar to
<br /> receivi�g a "certificate af occupancy" or final power release, If the project does no# involve a certificate of pccupancy or '
<br /> final pawer release, the fees must be paid prior ta permif issuance. Fur#hermare, if Pasco County WaterlSewer Irnpact
<br /> fees are due, they must be paid priar to permit issuance in accordance with applicable Pasco County ordinances.
<br /> � CONST'RUCTIQN LIEN L�►1�t�Chapter 713, �lorida�tatutes, as amended}: i�valuation of work is$2,500.00 or more, 1
<br /> certify that I, the applicant, have been provided with a copy of the "Florida Construction Lien Law—Homeowner's
<br /> Protection Guide" prepared by the Florida Department of Agriculture and Consumer Affairs. If the applican# is someone
<br /> other than#he"owner", 1 certify fhat i have abtained a copy af the above described dacument and promise in good faith to
<br /> deliver it ta the"owner" prior to commencement.
<br /> CONTRACT4R'S10WIVER'S AFEII�AVI'T: i certify that al1 the information in fh�s applicatian is accurate and that al1 work
<br /> will be done in compliance with all applicable laws regulating construction, zoning and land development. Application is
<br /> hereby made ta obtain a permit to da work and instailatian as indicated, i ce�tRfy that no wark ar instalEatian has
<br /> commenced priar to issuance of a permit and that all work wili be performed to meef standards of atl laws regutating
<br /> construction, County and City codes, zoning regulations, and land development regulations in the jurisdiction. ! also
<br /> certify that # understand that the regulatians of other gavernment agencies may apply#o the in#ended work, and that if is
<br /> my responsibility to identify what ac#ions I must take ta be in compliance. Such agencies include but are not limited to:
<br /> - Departrnent af Environmental Peotection-Cypress Bayheads, Vlletland Areas ancf Environ►nen#ally Sensitive
<br /> Lands, Wa#erNVastewater Treatment.
<br /> - Southwest Florida Water Management Distric#-Wells, Cypress Bayheads, Wetland Areas, �►1#ering
<br /> Watercourses.
<br /> - Army Corps of Engineers-Seawalls, Docks, Navigable Waterways.
<br /> - Department o# Health & Rehabilita#ive ServiceslEnvironmental Ffieal#h Unit-Wells, Wastewater Treatment,
<br /> Septic Tanks.
<br /> - US Enviranmentai Protection Agency-Asbestos abatement.
<br /> - Federal Aviation Authority-Runways.
<br /> I understand that the follow9ng restrictions apply to the use af fill:
<br /> - Use of fili is not atiowed in Fiaod Zane"V"unless expressty permitfed.
<br /> - If the fill material is to be used in Flood Zone "A", it is understood that a drainage plan addressing a .
<br /> "compensating volume" will be submiffed at fime of permitting �rhich is preparec! by a prafessional engineer
<br /> licensed by the State of Florida.
<br /> - if the fill material is to be used in Fiood Zane "A° in connection with a permitted buiiding using stem vt+ali
<br /> constructian, I certify that fill will be used anly to fill the area within the sfem wall. '
<br /> - !f fil4 material is to be used in any area, ! certify that use of such fill will not adve�sely affect adjacent
<br /> properfies. If use of fiil is found to ac3versely affect adjacent properties, the owner may be cited far violating
<br /> the conditions of the building permit issued under the attaahed permit application, for Iots less than one (1)
<br /> acre which are elevatec# by fill, an engirteered drainage pfan is required.
<br /> If I am the AGENT FOFZ THE OWFI�R, I promise in good faith to inform the owner of#he permitting conditions set farth in
<br /> this a�davit prior to commencing construetion. I understand that a separate permit may be required for eleatrica! work,
<br /> ptumbing, signs, welts, poois, air conditioning, gas, or ofher installations not specifically inciuded in the apptication. A
<br /> permik issued shall be construed to be a license to praceed with the work and not as autharity to.viola#e, cancel, al#er, or
<br /> set aside any provisions of the technical cod�s, nar shaii issuance of a permit prevent the Building O�ciat fram thereafter
<br /> requiring a correction of errors in plans, canstruction ar viola#ions af any codes. Every permit issued shall became invalid
<br /> unless the v+rork authorized by such perrrtit is cammenced within six months af permlt issuance, or if wark authorized by
<br /> the permit is suspended or abandaned for a period of six(6) months after the time the work is commenced. An extension
<br /> may be reques#ed, in writing, from the Build9ng O�cial for a period not to exceed ninety (90) days and wil! demonstrate
<br /> justifiabie cause far the extension. if work ceases far ninety(90}consecutive days, the job is considered abandoned.
<br /> WARNINC TO OWNEF2: YOUR FAI�URE TG1 RECt�E2D A NOTICE QF COMMENCE�l1ENT N1AY ��SUL.T 1N YOUF2
<br /> PAYING�TWICE FOR I�APROVERAENTS TO YOUR PROP�RTY. IF YOU INTEIdD TO OBTAIN FINAIdCING, CONSl1L7'
<br /> WtTN YUUR L�NQEFt UR�N ATTC�RNEY��FORE RECC?RDING YOUEt NQ'TICE OF GOMII�ENCEi1�ENT.
<br /> FLORIDA JURAT(F.S. 117.03)
<br /> OV4t�tER OR A�ENi' COEdTRACTO�i�.'�,�""�,...._-
<br /> Subscrtbed and swom to(or affirmed}before me this S scj��.ed nd swom to a a med before me this
<br /> by �(J'(� by� k} .��,�n�� �/lc.�.,,,�'�.
<br /> Wha istare personatty knawn to me or haslhave produced Wha{slar personal y rot�un to me or haslhave produced
<br /> as IdenBficabon. �'L,� �Lr1�---�"4 GA.w�.. as identlfication.
<br /> Notary Public ��� Notary Public
<br /> Commisslon No. Co sion ������,
<br /> ;: � UEUNE BOGES
<br /> '*= Comrrai
<br /> Name of Notary typed,printed or stamped Name of Nota ' ���' �t��F�ep�b��12 Z�,�4 '
<br /> roYFelnln,wra�ce800.3B5-IQl3�
<br />
|